Feng Yejian, Wei Yijin, Liu Zixiang. ERECTION TECHNIQUE OF SPACE STEEL MEGA-TRUSS FOR THE NATIONAL STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 30-33. doi: 10.13204/j.gyjz200701009
Citation:
Feng Yejian, Wei Yijin, Liu Zixiang. ERECTION TECHNIQUE OF SPACE STEEL MEGA-TRUSS FOR THE NATIONAL STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 30-33. doi: 10.13204/j.gyjz200701009
Feng Yejian, Wei Yijin, Liu Zixiang. ERECTION TECHNIQUE OF SPACE STEEL MEGA-TRUSS FOR THE NATIONAL STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 30-33. doi: 10.13204/j.gyjz200701009
Citation:
Feng Yejian, Wei Yijin, Liu Zixiang. ERECTION TECHNIQUE OF SPACE STEEL MEGA-TRUSS FOR THE NATIONAL STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 30-33. doi: 10.13204/j.gyjz200701009
For the project of erecting the steel structures of the national stadium,the main truss was divided into two lifting elements,i.e.space 3-D truss and 2-D truss according to the actual conditions.Therefore,the multiport-butt of 3-D truss,as well as the stability of turning over 2-D truss were the difficulties of the lifting project.