Chen Ai-jiu, Huo Hong-yuan, Huo Hui-jun, Zhu Ya-lei. THE INTEGRALLY JACK-UP TECHNIQUE FOR A MAIN HALL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 99-101. doi: 10.13204/j.gyjz200605026
Citation:
Chen Ai-jiu, Huo Hong-yuan, Huo Hui-jun, Zhu Ya-lei. THE INTEGRALLY JACK-UP TECHNIQUE FOR A MAIN HALL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 99-101. doi: 10.13204/j.gyjz200605026
Chen Ai-jiu, Huo Hong-yuan, Huo Hui-jun, Zhu Ya-lei. THE INTEGRALLY JACK-UP TECHNIQUE FOR A MAIN HALL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 99-101. doi: 10.13204/j.gyjz200605026
Citation:
Chen Ai-jiu, Huo Hong-yuan, Huo Hui-jun, Zhu Ya-lei. THE INTEGRALLY JACK-UP TECHNIQUE FOR A MAIN HALL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 99-101. doi: 10.13204/j.gyjz200605026
Different saftenings and subsidences appeared on the foundations of most of ancient main halls as time went on,by which a good many problems were produced for the protections of main halls.Through the practical field investigation,a good plan for solving the problems of the main halls can be designed using building integrally jack-up technique that can reinforce the main halls and jack-up them in-situ without destroying their former structures.