[1] | LIU Weiran, GUO Shida, FANG Bin, YU Haifeng, WANG Jiawei, GAO Renqing, YE Xihao, HAN Jiantian. Research on the Mechanical Properties of Steel Truss Support Platform During the Construction of the Roof of a Large-Scale Silo[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(2): 263-270. doi: 10.3724/j.gyjzG22031614 |
[2] | LIANG Yan, WEI Yingying, FENG Haoqi, ZHAO Ming, GUO Jing. Simulation Analysis on Construction Processes of Long-Span and Complex Steel Frames with Inclined Pillars[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(2): 75-80. doi: 10.13204/j.gyjzG201902180009 |
[3] | ZHOU Yan-ling, CAO Da-fu, WANG Kun, GE Wen-jie, LIU Jia-qi. Analysis of Creep Effect of Prestressed Concrete Continuous Beam Bridge in Construction Process[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(9): 101-107. doi: 10.13204/j.gyjzg21060914 |
[4] | GAO Peng, GE Changwen, LIU Maofang, MENG Lei, YIN Zongcheng, WANG Zhiqiang, GAN Zhengyong, YANG Xuan, ZHU Jie. Numerical Analysis of Crack Resistance of Concrete Structure of Ultra-Long Round Stadium During Construction[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 94-99,110. doi: 10.13204/j.gyjzG22073006 |
[5] | XIONG Ye, DING Yang, CHA Lyuying, CHEN Zizi, LIU Yangwu. Dynamic Characteristics of Axial Flow Compressor Foundations Considering Interaction of Foundation, Pile Foundations and Superstructures[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(6): 150-155,149. doi: 10.13204/j.gyjzG21052007 |
[6] | AN Daoyao. Safety Limit Analysis for the Whole Construction Process of a Super High-Rise Building Under Strong Earthquakes[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(3): 117-122. doi: 10.13204/j.gyjzG21062921 |
[7] | Huo Runke, Li Maoda, Li Jing, Wang Qiang, Yan Jirui. NUMERICAL SIMULATION AND ANALYSIS OF TUNNEL CONSTRUCTION PROCESS OF UNSYMMETRICAL TUNNEL IN SOFT ROCK[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(2): 95-100. doi: 10.13204/j.gyjz201502021 |
[8] | He Chunbao, Huang Juqing. ANALYSIS OF INTERACTION AMONG ADJACENT RECTANGULAR FOUNDATIONS AND GROUND[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(10): 71-77. doi: 10.13204/j.gyjz201310016 |
[9] | Xiong Xueyu, Cheng Chen, Li Yuan, LüPin. STUDY ON THE CONSTRUCTION PROCESS OF PRESTRESSED CONCRETE FRAME TAKING ACCOUNT OF THE IMPACT OF THE SECONDARY INTERNAL FORCE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(12): 12-15. doi: 10.13204/j.gyjz201112003 |
[10] | Zheng Jiang, Hao Jiping, Li Cunliang, Yang Xiaoli, Wang Xiantie, Liu Shaowen. MECHANICS EMULATION AND ANALYSIS OF THE HESHI STUPA OF FAMEN TEMPLE DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(10): 90-95. doi: 10.13204/j.gyjz200910022 |
[11] | LüWenzhi, Yu Jianlin, Zheng Wei, Gong Xiaonan, Jing Zijing. STUDY OF ANALYTIC SOLUTION OF COMPOSITE GROUND UNDER FLEXIBLE FOUNDATION BASED ON SUPER-SUB STRUCTURE INTERACTION[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(4): 77-83. doi: 10.13204/j.gyjz200904018 |
[12] | Wang Tianfeng, Ding Zhichao, Wang Li, Ying XiaoLin. ANALYSIS OF INTEGRAL COLLAPSE OF A REINFORCED CONCRETE SILO[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(4): 116-118. doi: 10.13204/j.gyjz200804029 |
[13] | Liu Xuewu, Guo Yanlin, Zhang Qinglin, Liu Luyu. ANALYSIS OF INTERNAL FORCE AND DEFORMATION FOR THE NEW CCTV HEADQUARTERS DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(9): 22-29. doi: 10.13204/j.gyjz200709004 |
[14] | Cui Chunyi, Luan Maotian, Yang Qing. NUMERICAL ANALYSIS OF ENTIRE INTERACTIVE SYSTEM OF RAFT FOUNDATION CONSIDERING STRUCTURAL STIFFNESS EFFECT[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 57-61,68. doi: 10.13204/j.gyjz200701015 |
[15] | Mao Jinping, Xu Wei. RELIABILITY ANALYSIS OF ROCK- SOCKETED SUPPORT STRUCTURES WITH REAL- TIME DEFORMATION CONTROL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(2): 42-44. doi: 10.13204/j.gyjz200602013 |
[16] | Chen Yunmin, Chen Renpeng, Huang Haidan. DEFINITION OF RELATIVE RIGIDITY AND PROPER RAFT THICKNESS OF PILE-RAFT FOUNDATION[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 1-4,23. doi: 10.13204/j.gyjz200505001 |
[17] | Wang Yingge. FIELD TEST AND NUMERICAL ANALYSIS OF INTERACTION OF PILE- RAFT FOUNDATION ULTRA - HIGH TUBE-IN-TUBE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 10-15. doi: 10.13204/j.gyjz200505003 |
[18] | Xu Qiang, Wu Shengxing. NON-LINEAR FEM ANALYSIS OF INTERACTION AMONG PILE-SUPPORT, PILES AND SOIL OF A CABLE-STAYED BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 16-19. doi: 10.13204/j.gyjz200505004 |
[19] | Bao Yan, Ye Weidong, Zhang Baoliang, Zhao Xihong. A STUDY ON UNDERGROUND ENGINEERING AT HENGLONG PLAZA IN SHANGHAI[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 91-95. doi: 10.13204/j.gyjz200412028 |
[20] | Guo Yanlin, Cui Xiaoqiang. KEY TECHNICAL PROBLEMS AND DISCUSSION IN CONSTRUCTION PROCESS OF LARGE SPAN STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 1-5,22. doi: 10.13204/j.gyjz200412001 |