Citation: | Jiang Li, Chen Lun. ANALYTICAL SOLUTION FOR THE LOAD-DISPLACEMENT RELATIONSHIP OF PULLOUT DX PILE BASED ON ELASTIC THEORY[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 65-70. doi: 10.13204/j.gyjz200605018 |
刘祖德. 抗拔桩基础PP刘金砺. 桩基工程技术. 北京: 中国建材工业出版社,1996
|
徐至钧, 张国栋. 新型桩挤扩支盘桩设计与工程应用. 北京: 机械工业出版社, 2003
|
贺德新,沈保汉. DX 挤扩装置及 DX 多节挤扩桩的应用. 工业建筑,2001, 31(1): 27-31
|
王海燕. 大比例尺现场模型 DX 桩的试验研究: [硕士学位论文]. 北京: 清华大学, 2003
|
Randolph M F,Wroth C P. Analysis of Deformation of Vertically LoadedPiles. Journal of the Geotechnical Engineering Division, ASCE, 1978,104(12):1 465-1 488
|
5桩基工程手册6编写委员会. 桩基工程手册. 北京: 中国建筑工业出版社,1995
|
沈珠江. 计算土力学. 上海: 上海科学技术出版社, 1990
|
黄 锋. 单桩在压与拔荷载下桩侧摩阻力发展机理研究: [博士学位论文]. 北京: 清华大学, 1998
|
沈珠江. 理论土力学. 北京: 中国水利水电出版社, 2000
|
杨位. 地基及基础. 北京: 中国建筑工业出版社, 1998
|
[1] | LIN Sen, XUE Huajun, ZHANG Yuanjian. DEFORMATION CONTROL OF PILE FOUNDATIONS FOR A LONG-SPAN CABLE-STAYED BRIDGE UNDER CONSTRUCTION OF A LIGHT RAIL STATION WITH THE PILE-BEAM-ARCH METHOD[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(2): 206-210,198. doi: 10.13204/j.gyjzG20092701 |
[2] | Luo Shao-feng, Yang Wen-xing. COMPARATIVE TEST RESEARCH ON UPLIFT PILE AND COMPRESSIVE PILE IN LOESS GROUND[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 78-82. doi: 10.13204/j.gyjz201210018 |
[3] | LüFanren, Yin Jiming, Jin Yaohua, Yao Rong. ANALYSIS OF PILE IN CONSIDERATION OF PLASTIC INTERACTION BETWEEN PILE AND SOIL[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(7): 52-55,41. doi: 10.13204/j.gyjz201007014 |
[4] | Sun Xiaoli, Tang Mengxiong, Zhou Zhiguo. AN ELASTIC-PLASTIC ANALYTICAL CALCULATION OF DEFORMATION OF THE TENSION PILES[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(3): 82-87. doi: 10.13204/j.gyjz201003019 |
[5] | Shen Baohan, Wang Yan, Qi Di, Zhang Xinsheng, Sun Junping, He Dexin, Lan Lan. TEST STUDY OF DX PILES WITH THREE AND FOUR BULBS AT NBZK ELECTRIC POWER PLANT IN INNER MONGOLIA[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 55-63. doi: 10.13204/j.gyjz200902007 |
[6] | Shen Baohan, Wang Yan, Zhou Qingchun, He Dexin, Liu Zhenliang. TEST STUDY AND APPLICATION OF DX PILE WITH FOUR BULBS AT WUHAN WWPROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 8-15. doi: 10.13204/j.gyjz200902002 |
[7] | Shen Baohan, Wang Haiyan, Sun Junping, He Dexin, Li Yanli, Liu Ying, Zeng Yajie. TEST STUDY OF DX PILES WITH SINGLE AND DOUBLE BULBS AT TANG SHAN HTW ELECTRIC PLANT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 16-25,122. doi: 10.13204/j.gyjz200902003 |
[8] | Shen Baohan, Wang Haiyan, Liu Zhenliang, He Dexin. TEST STUDY OF DX PILE WITH FOUR BULBS AT XI'AN SXD PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 1-7. doi: 10.13204/j.gyjz200902001 |
[9] | Shen Baohan, Lan Lan, Wang Yan, Liu Zhenliang, He Dexin. TEST STUDY OF DX PILESWITH DOUBLE BULBS AT HENAN HMQ ELECTRIC POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 38-44,63. doi: 10.13204/j.gyjz200902005 |
[10] | Shen Baohan, Wang Yan, Zhao Hui, Zhou Xiaobo, Wang Xing, He Jiandong, He Dexin, Qi Zhicheng. TEST STUDY OF COMPRESSION AND TENSION BEARING MECHANISM OF DX PILES WITH DOUBLE BULBS AT BEIJING BGFD WIND POWER STATION[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 45-54,79. doi: 10.13204/j.gyjz200902006 |
[11] | Shen Baohan, Wang Yan, Liu Zhenliang, He Dexin, Geng Yuping. TEST STUDY OF DX PILES WITH SINGLE AND DOUBLE BULBS AT NANYANG HNR THERMO-ELECTRIC PLANT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 26-37. doi: 10.13204/j.gyjz200902004 |
[12] | Shen Baohan. DX PILE AND ITS SEVERAL PROBLEMS OF VERTICAL BEARING CAPACITIES[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(8): 84-95. doi: 10.13204/j.gyjz200908022 |
[13] | Shen Baohan, He Dexin. DX PILE WITH MULTI-UNDER-EXTRUDING BRANCHES AND DX EXTRUDING DEVICE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(5): 1-4. doi: 10.13204/j.gyjz200805001 |
[14] | Li Guangxin, Tang Fei. ANALYSIS AND RESEARCH OF TENSILE RESISTANCE FOR LOAD-CARRYING PLATE OF DX PILE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(6): 52-55,60. doi: 10.13204/j.gyjz200506015 |
[15] | Liu Qijian, Yang Linde. ANALYSIS OF VERTICAL BEARING CAPACITY AND DISPLACEMENT BY THE SETTLEMENT OF PILE TOP[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(3): 35-37. doi: 10.13204/j.gyjz200503014 |
[16] | Shen Baohan, Niu Dongsheng, Yu Chengjie. EXPERIMENTAL STUDY ON INTEGRITY DETECTION OF FUIL-SCALE MODEL DX PILES CAST-IN-SITU[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(3): 19-20,43. doi: 10.13204/j.gyjz200403005 |
[17] | Shen Baohan, He Dexin, Liu Zhengliang, Guo Guixia, Sun Junping. DX PILE WITH MULTI-UNDER-EXTRUDING BRANCHES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(3): 1-4,8. doi: 10.13204/j.gyjz200403001 |
[18] | Chen Lun, Jiang Li, Wang Haiyan, He Dexin, Sun Junping. FIELD FULL-SCALE TEST STUDY ON TENSION BEARING MECHANISM OF DX PILES CAST-IN-SITU[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 33-35,46. doi: 10.13204/j.gyjz200410010 |
[19] | Chen Lun, Wang Haiyan, Shen Baohan, He Dexin, Sun Junping. FULL-SCALE TEST STUDY ON BEARING MECHANISM AND LOAD TRANSMISSION MODE OF DX PILES CAST-IN-SITU[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(3): 5-8. doi: 10.13204/j.gyjz200403002 |
[20] | Chun Lun, Wang Haiyan, Shen Baohan, He Dexin, Sun Junping. FULL-SCALE TEST STUDY ON UNIT SHAFT RESISTANCE AND UNIT END RESISTANCE OF DX PILES CAST-IN-SITU[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(3): 15-18,39. doi: 10.13204/j.gyjz200403004 |