Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Citation:
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Citation:
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
According to the testing data of binding material hydration heat, temperature differences at every setting time and every part of the concrete walls can be estimated approximately by a certain theoretical hypothesis.It is proved that the maximal temperature differences of mass concrete in Xuanwu Lake Tunnel which caused by hydration heat were within 25℃,and they were accorded with the requirements proposed by engineering.
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016