Wang Mingbo. ANALYSIS METHOD OF INTERACTION BETWEEN FOUNDATION EXCAVATION AND ADJACENT BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(8): 56-58. doi: 10.13204/j.gyjz200408019
Citation:
Wang Mingbo. ANALYSIS METHOD OF INTERACTION BETWEEN FOUNDATION EXCAVATION AND ADJACENT BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(8): 56-58. doi: 10.13204/j.gyjz200408019
Wang Mingbo. ANALYSIS METHOD OF INTERACTION BETWEEN FOUNDATION EXCAVATION AND ADJACENT BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(8): 56-58. doi: 10.13204/j.gyjz200408019
Citation:
Wang Mingbo. ANALYSIS METHOD OF INTERACTION BETWEEN FOUNDATION EXCAVATION AND ADJACENT BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(8): 56-58. doi: 10.13204/j.gyjz200408019
A analysis method is provided for interaction between foundation excavation and adjacent building. Some problems and their treating measures are discussed in the process of constructing a building.