[2] | Zou Jianwen, Xu Wei. STUDY ON THERMAL STRESS CONTROL OF RISE PILE CAP MASS-CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(9): 85-89. doi: 10.13204/j.gyjz201109019 |
[3] | Chen Lihua, Zhang Xinbin, Simon Chen, Cheng Daye, Zhang Zhong. SITE MONITORING OF MASS CONCRETE STRAIN OF FOUNDATION OF CPR1000 NUCLEAR POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 24-26,38. doi: 10.13204/j.gyjz201001008 |
[4] | Wang Yong, Zhang Xinbin, Cheng Daye, Zhang Zhong. THERMAL STRESS OF MASS CONCRETE FOR FOUNDATION OF CPR1000 NUCLEAR POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 11-13,63. doi: 10.13204/j.gyjz201001004 |
[5] | Chen Lihua, Zhang Xinbin, Cheng Daye, Zhang Zhong. HYDRATION OF MASS CONCRETE FOR FOUNDATION OF NUCLEAR POWER PLANTS[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 14-16. doi: 10.13204/j.gyjz201001005 |
[6] | Zhang Xinbin, Simon Chen, Cheng Daye, Zhang Zhong. CRACK CONTROL OF MASS CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 1-4. doi: 10.13204/j.gyjz201001001 |
[7] | Wang Dingtang. CRACK CONTROL OF MASS CONCRETE FOUNDATION AT EARLY AGE AND ITS TECHNOLOGY APPLICATION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(3): 139-143,87. doi: 10.13204/j.gyjz201003030 |
[8] | Liu Wei, Dong Bixin, Li Weiwen, Xing Feng. THE STUDY ON THERMAL STRESS AND TEMPERATURE CRACK OF UNDERGROUND MASS CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(7): 79-81,130. doi: 10.13204/j.gyjz200807019 |
[9] | Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016 |