[3] | Li Lianxiang Fu Qinghong Zhang Haiping, . PROGRESS AND KEY TECHNOLOGY OF CENTRIFUGAL MODEL TEST ON FOUNDATION PIT ENGINEERING[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(10): 142-149. doi: 10.13204/j.gyjz201510027 |
[4] | Xie Haijian, LüHenglin, Zhang Jie, Ye Yafei. REINFORCED DESIGN AND THE KEY CONSTRUCTION TECHNIQUE OF THE MAIN STRUCTURE OF BELT CORRIDOR IN A COAL MINE[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(1): 131-135. doi: 10.13204/j.gyjz201301029 |
[5] | Huang Mingxin, Liu Zixiang, Dai Weizhi, Lin Guanzhi, Yu Ronghua, Liu Zhonghua. KEY TECHNOLOGIES OF THE STEEL STRUCTURE FABRICATION AND ERECTION OF NATIONAL STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(5): 73-76. doi: 10.13204/j.gyjz200705019 |