| [1] | WANG Yao, ZHANG Hao, ZHANG Feng, LI Yang, LI Dong, BAO Min. Construction Methods and Process Optimization of Prestressed Reverse Tension for Long-Span Steel Structure Roofs[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(8): 268-276. doi: 10.3724/j.gyjzG23112217 |
| [2] | Chen Junyi, Zou Daoqin, Gan Gang. ANALYSIS OF UNBONDED PRESTRESSED TECHNIQUE IN CONTROLLING TEMPERATURE STRESS OF SUPER-LONG STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(3): 52-55,83. doi: 10.13204/j.gyjz200803015 |
| [3] | Shang Renjie, Wu Zhuanqin, Yu Yuanpeng, Yue Yanbo, Gong Xisheng. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN CONCRETE GRID-BEAM STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 36-39. doi: 10.13204/j.gyjz200811010 |
| [4] | Yang Xiao-bo, Liu Qun-di, Jiao Bin-ru. DESIGN CHARACTERISTICS OF ULTRA-LONG SLAB-COLUMN STRUCTURE WITH UNBONDED PRESTRESSED R. C.[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(10): 107-108. doi: 10.13204/j.gyjz200610030 |