Li Bingnan, Dai Hang, Zhang Jiwen. RESEARCH ON REALIZATION OF SEISMIC DUCTILITY BY HIGH STRENGTHREBAR FOR RAILWAY PIERS WITH LOW REINFORCEMENT RATIOS[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 88-91.
Citation:
Li Bingnan, Dai Hang, Zhang Jiwen. RESEARCH ON REALIZATION OF SEISMIC DUCTILITY BY HIGH STRENGTHREBAR FOR RAILWAY PIERS WITH LOW REINFORCEMENT RATIOS[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 88-91.
Li Bingnan, Dai Hang, Zhang Jiwen. RESEARCH ON REALIZATION OF SEISMIC DUCTILITY BY HIGH STRENGTHREBAR FOR RAILWAY PIERS WITH LOW REINFORCEMENT RATIOS[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 88-91.
Citation:
Li Bingnan, Dai Hang, Zhang Jiwen. RESEARCH ON REALIZATION OF SEISMIC DUCTILITY BY HIGH STRENGTHREBAR FOR RAILWAY PIERS WITH LOW REINFORCEMENT RATIOS[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 88-91.
The railway bridge piers with low reinforcement ratios are still widely used in our country,which have poor
deformation capacity and brittle failure mode under earthquake. In order to improve the seismic performance of such a
kind of piers,the idea of using high strength rebar to realize seismic ductility for piers with low reinforcement ratios is
put forward. A HRBF500 reinforced pier specimen with low reinforcement ratio was tested under low-cycle loading.
The failure mode,hysteretic characteristics,stiffness degradation,energy dissipation and ductility of the specimen
were studied. The results indicate that the failure pattern of the specimen is ductile failure. Furthermore,the
realization mechanism of seismic ductility by high strength rebar for piers with low reinforcement ratios is further
analyzed.