Zhang Xianmei, Guo Zhaoru, Wang Xiaoyan. INVESTIGATION OF UNDERGROUND COURTYARD IN THE WEST OF HENAN AND ITS SUSTAINABLE REFORMED TECHNOLOGY[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 61-64.
Citation:
Zhang Ailin, Zhang Jinai, Liu Xuechun. RESEARCH ON THE KEY PROBLEMS OF FLOOR SLAB SLOT IN ASSEMBLED STEEL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 39-45.
Zhang Xianmei, Guo Zhaoru, Wang Xiaoyan. INVESTIGATION OF UNDERGROUND COURTYARD IN THE WEST OF HENAN AND ITS SUSTAINABLE REFORMED TECHNOLOGY[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 61-64.
Citation:
Zhang Ailin, Zhang Jinai, Liu Xuechun. RESEARCH ON THE KEY PROBLEMS OF FLOOR SLAB SLOT IN ASSEMBLED STEEL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 39-45.
The assembled floor slab that applied in modular assembled high-rise steel structure is a discontinuity
slab. As for its assembled slot,assembled slab has an insufficient plane stiffness,which effect its integrity function.
To insure the plane stiffness and integrity of assembled slab,three kinds of connectors were designed,i. e. beam
connector,slab connector and beam-slab connector. Considering connector types and connector spacing,ABAQUS
was used to analyse a failure character of floor slab,bearing capacity,slab slot shear rigidity,stress transmission
capacity between slab slot and the slot value of assembled shear slab, to obtain the performance and the force
transmission effect of the slab slot. The analysis results show that the connector spacing is the main factor affecting the
plane stiffness of assembled slab,just adopting only beam connector cannot control slab slot well,slab connector and
beam-slab connector are the effective connections in assembled slab slot. It is suggested that the slab connector
spacing and the beam-slab connector spacing should be controlled within 0. 75 m and 1. 0 m respectively.
Zhang Xianmei, Guo Zhaoru, Wang Xiaoyan. INVESTIGATION OF UNDERGROUND COURTYARD IN THE WEST OF HENAN AND ITS SUSTAINABLE REFORMED TECHNOLOGY[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 61-64.
Zhang Xianmei, Guo Zhaoru, Wang Xiaoyan. INVESTIGATION OF UNDERGROUND COURTYARD IN THE WEST OF HENAN AND ITS SUSTAINABLE REFORMED TECHNOLOGY[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 61-64.