Gao Jingbin, Zhang Huiying, Wu Wenxian. EXTENSION_STORY AND REINFORCEMENT DESIGN OF A FRAMED OFFICE BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(9): 92-94.
Citation:
Gao Jingbin, Zhang Huiying, Wu Wenxian. EXTENSION_STORY AND REINFORCEMENT DESIGN OF A FRAMED OFFICE BUILDING[J]. INDUSTRIAL CONSTRUCTION , 2006, 36(9): 92-94.
Gao Jingbin, Zhang Huiying, Wu Wenxian. EXTENSION_STORY AND REINFORCEMENT DESIGN OF A FRAMED OFFICE BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(9): 92-94.
Citation:
Gao Jingbin, Zhang Huiying, Wu Wenxian. EXTENSION_STORY AND REINFORCEMENT DESIGN OF A FRAMED OFFICE BUILDING[J]. INDUSTRIAL CONSTRUCTION , 2006, 36(9): 92-94.
EXTENSION_STORY AND REINFORCEMENT DESIGN OF A FRAMED OFFICE BUILDING
Received Date: 2006-01-10
Publish Date:
2006-09-20
Abstract
The extension_story design of a framed office building is introduced, including strengthening methods by increasing section area and enwrapping steel, as well as the connecting approaches of elongating columns and extending stairs. Some key points in the design work are discussed, which can be applied to similar projects.
References
卜良桃, 王济川 1 建筑结构加改造设计与施工. 长沙: 湖南大学出版社, 2002
[2] 齐俊玲, 李如白 , 娄宇,等. 钢筋混凝土框架结构加层抗震加固设计. 工业建筑, 2004, 34(6) : 63-65
[3] CECS 25B 90 混凝土结构加固技术规范
[4] GB 50001-2001 建筑抗震设计规范
Proportional views