Citation: | ZHANG Xiaowei, RONG Xian, YANG Hongwei, ZHANG Jianxin. Research on Mechanical Properties of Prefabricated High-Strength Steel Reinforced Concrete Beam-Column Joints with Steel Ends[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(11): 110-116. doi: 10.13204/j.gyjzG22051211 |
[1] |
范力.装配式预制混凝土框架结构抗震性能研究[D].上海:同济大学,2007.
|
[2] |
BRECCOLOTTI M, GENTILE S, TOMMASINI M, et al. Beam-column joints in continuous RC frames:comparison between cast-in-situ and precast solutions[J]. Engineering Structures, 2016(127):129-144.
|
[3] |
吴刚,冯德成.装配式混凝土框架节点基本性能研究进展[J].建筑结构学报, 2018, 39(2):1-16.
|
[4] |
毛晨曦,于樵,张昊宇,等.预应力自复位钢筋混凝土柱及梁柱节点拟静力试验研究[J].自然灾害学报,2017,26(6):1-12.
|
[5] |
李虎,杜永峰,李芳玉.装配式混凝土梁柱节点抗震性能试验研究及参数分析[J].建筑结构学报,2021,42(增刊1):88-97.
|
[6] |
KHALOO A, DOOST R B. Seismic performance of precast RC column to steel beam connections with variable joint configurations[J]. Engineering Structures, 2018(160):408-418.
|
[7] |
KIM J H, CHO Y S, LEE K H. Structural performance evaluation of circular steel bands for PC column-beam connection[J]. Magazine of Concrete Research, 2013,65:1377-1384.
|
[8] |
郭彤,宋良龙.腹板摩擦式自定心预应力混凝土框架梁柱节点的理论分析[J].土木工程学报, 2012,45(7):73-79.
|
[9] |
高培楠,邓扬,李爱群,等.装配式混凝土框架结构连接节点抗震性能研究进展[J].工业建筑,2021,51(2):171-185
,152.
|
[10] |
侯光荣,王绪续,吕娜娜,等.新型装配式部分型钢混凝土框架梁柱节点抗震性能试验研究[J].建筑结构, 2018,48(7):27-32.
|
[11] |
张健新,张标,戎贤,等.新型装配式混凝土框架连接节点抗震性能试验[J].地震工程与工程振动,2020,40(2):164-170.
|
[12] |
阎利,吴庭鸿,拓万永,等.预制装配式结构连接节点研究进展综述[J].建筑科学,2020,36(5):126-132.
|
[13] |
VIDJEAPRIYA R, JAYA K P. Experimental study on two simple mechanical precast beam-column connections under reverse cyclic loading[J]. Journal of Performance of Constructed Facilities, 2013, 27(4):402-414.
|
[14] |
WU C L, LIU J M, TAN W Y, et al. Seismic behavior of composite interior joints of prefabricated H-shaped steel reinforced concrete column-steel beam[J]. Structures, 2020, 23:558-572.
|
[15] |
GHOSH S K, CLELAND N. Observations from the February 27, 2010, earthquake in Chile[J]. PCI Journal, 2012(57):52-75.
|
[16] |
SAUSE R, FROSCH R, GHOSH S K, et al. Preview of PCI's japan earthquake reconnaissance team report[J]. PCI Journal, 2012(57):47-51.
|
[17] |
孙治国,王东升,李宏男,等.汶川地震钢筋混凝土框架震害及震后修复建议[J].自然灾害学报,2010,19(4):114-123.
|
[18] |
BOURNAS D A, NEGRO P, TAUCER F F. Performance of industrial buildings during the Emilia earthquakes in Northern Italy and recommendations for their strengthening[J]. Bulletin of Earthquake Engineering, 2014(12):2383-2404.
|
[19] |
张健新,戎贤,吴海超.配置600 MPa级钢筋混凝土框架边节点滞回性能试验研究[J].工业建筑, 2017, 47(6):30-33.
|
[20] |
WU C L, LIU J M, SHI W. Seismic performance of composite joints between prefabricated steel-reinforced concrete columns and steel beams:experimental study[J]. Bulletin of Earthquake Engineering, 2020,18(8):3817-3841.
|