Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 52 Issue 10
Oct.  2022
Turn off MathJax
Article Contents
WANG Chao, TANG Dongyue, HUANG Jianfeng, LI Jiangang. Research on Construction Simulation and Monitoring for Demolition and Reconstruction of Concrete Frame Structure[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 100-105. doi: 10.13204/j.gyjzG22042613
Citation: WANG Chao, TANG Dongyue, HUANG Jianfeng, LI Jiangang. Research on Construction Simulation and Monitoring for Demolition and Reconstruction of Concrete Frame Structure[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 100-105. doi: 10.13204/j.gyjzG22042613

Research on Construction Simulation and Monitoring for Demolition and Reconstruction of Concrete Frame Structure

doi: 10.13204/j.gyjzG22042613
  • Received Date: 2022-04-26
    Available Online: 2023-03-22
  • A concrete frame structure needs to be reconstructed due to functional updating. In order to meet the requirements of large space, massive columns, beams, and plates need to be demolished, which indicates a high safety risk. Therefore, finite element analysis was carried out to simulate structural state changes during the demolition and optimize reconstruction and monitoring schemes. During the reconstruction, automatic monitoring and manual inspection were adopted to monitor the inclination, settlement, deflection, and damage of the structure. It is shown that the measured values are in good agreement with the construction simulation and analysis results, and there is no alarm and no obvious structural damage during the monitoring period. The combination of construction simulation and monitoring can effectively reduce structural safety risks during the reconstruction.
  • loading
  • [1]
    上海市应急管理局.上海市长宁区昭化路148号①幢厂房"5·16

    "坍塌重大事故调查报告[R/OL].(2019-10-30)[2022-4-15]. http://yjglj.sh.gov.cn/xxgk/xxgkml/dcpghtj/dcbg/20191030/0037-33268.html.
    [2]
    深圳市应急管理局.深圳市体育中心改造提升拆除工程"7·8"较大坍塌事故调查报告[R/OL]. (2019-09-26)[2022-4-15]. http://yjgl.sz.gov.cn/yjgl/zhjg/sgdc/content/post_3653154.html.
    [3]
    福建省应急管理厅.福建省泉州市欣佳酒店"3.7"坍塌事故调查报告[R/OL].(2020-09-03)[2022-4-15]. http://yjt.fujian.gov.cn/zfxxgk/zfxxgkml/aqsczfyjd/202009/t20200903_5380116.htm.
    [4]
    江苏省应急管理厅.苏州市吴江区"7·12"四季开源酒店辅房坍塌事故调查报告[R/OL].(2022-03-28)[2022-4-15]. http://ajj.jiangsu.gov.cn/art/2022/3/28/art_3154_10392295.html.
    [5]
    中国建筑科学研究院.建筑业10项新技术[M].北京:中国建筑工业出版社,2017.
    [6]
    马镇炎,王锦文,张梅松,等.既有大跨度结构托柱改造的关键问题研究[J].建筑结构,2021,51(16):81-85.
    [7]
    宋彪,李宏男,任亮,等.某钢结构梁高温切割全过程的监测与分析[J].工程力学,2016,33(9):69-75.
    [8]
    杨维国,洪国松,王明珠,等.多层大悬挑钢结构施工全过程仿真分析研究[J].建筑结构学报,2012,33(4):87-94.
    [9]
    石开荣,吕俊锋,姜正荣,等.复杂高层悬挂结构施工过程模拟分析及监测研究[J].工业建筑,2017,47(4):134-139.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (66) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return