GAO Shenglei, WANG Kaili, LIU Zan, ZHANG Mi, DONG Xiaopeng. Study on Force Characteristics of Jacked Pipes Under Construction of Large-Diameter and Spatially C-Shaped Curve Tunnels[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(3): 67-70,76. doi: 10.13204/j.gyjzG21060907
Citation: GAO Shenglei, WANG Kaili, LIU Zan, ZHANG Mi, DONG Xiaopeng. Study on Force Characteristics of Jacked Pipes Under Construction of Large-Diameter and Spatially C-Shaped Curve Tunnels[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(3): 67-70,76. doi: 10.13204/j.gyjzG21060907

Study on Force Characteristics of Jacked Pipes Under Construction of Large-Diameter and Spatially C-Shaped Curve Tunnels

doi: 10.13204/j.gyjzG21060907
  • Received Date: 2021-06-09
  • Taking power tunnels as research objects, the field measurement was conducted to study and analyze the force characteristics of jacked pipes under construction of a large-diameter, long-distance and spatially C-shaped curve. The results showed that: in the case of pipe sections in full contact with slurry, the total thrust had few relations with the cumulative jacked distances, and the thickness of overlying soil had an effect on the contact pressure of pipe walls, but the grouting pressure was the dominant factor; the stress in circumferential rebas was mainly in compression, pipe sections was in compression on the inside and in tension on the outside, and the diameters at the ends of pipe sections were compressed to "ellipsoid"; the longitudinal rebars in the left and upper parts of pipe sections were in compression, as well as the rebars in the right and lower parts of pipe sections were in tension, and the pipe sections were deflected under the action of bending moment and the middle part of the pipe sections deflected to the right. Thus, the reasonable distribution of rebars and increasing prestressed rebars could optimize the pipeline design, improve pipeline performances and economic benefits.
  • loading
  • [1]
    王雪,王成虎,马孝春,等.国内外顶管施工技术的对比分析[J].施工技术,2017,46(增刊2):1018-1023.
    [2]
    洪开荣.我国隧道及地下工程近两年的发展与展望[J].隧道建设,2017,37(2):123-134.
    [3]
    CHENG W C,NI J C,SHEN S,et al.Investigation into factors affecting jacking force:a case study[J].Geotechnical Engineering,2017,170(4):322-334.
    [4]
    叶艺超,彭立敏,杨伟超,等.考虑泥浆触变性的顶管顶力计算方法[J].岩土工程学报,2015,37(9):1653-1659.
    [5]
    SHOU K,YEN J,LIU M.On the frictional property of lubricants and its impact on jacking force and soil-pipe interaction of pipe-jacking[J].Tunnelling& Underground Space Technology,2010,25(4):469-477.
    [6]
    黄宏伟,胡昕.顶管施工力学效应的数值模拟分析[J].岩石力学与工程学报,2003(3):400-406.
    [7]
    魏纲,徐日庆,余剑英,等.顶管施工中管道受力性能的现场试验研究[J].岩土力学,2005(8):1273-1277.
    [8]
    刘翔.软土中4 m直径混凝土顶管施工管土受力特性测试与分析[D].上海:上海交通大学,2014.
    [9]
    雷晗,陈锦剑,王建华,等.大直径砼顶管的管道受力特性分析[J].上海交通大学学报,2011,45(10):1493-1497.
    [10]
    黄吉龙,陈锦剑,王建华,等.大口径顶管顶进过程的数值模拟分析[J].地下空间与工程学报,2008(3):489-493.
    [11]
    王承德.顶进管道受力分析[J].特种结构,2006(4):87-89.
    [12]
    顾长虹.深埋长距离顶管推进管-土-浆相互作用关系与减阻技术[D].北京:中国矿业大学,2020.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (50) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return