Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 50 Issue 12
Mar.  2021
Turn off MathJax
Article Contents
FANG Zhen, XIAO Miaowu, YU Xiaohui, ZHAO Zhicheng. UNDERPINNING REINFORCEMENT TECHNIQUE FOR CONSTRUCTING SUBWAY STATION PASSAGE UNDERPASSING THE EXISTING TUNNEL BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(12): 172-179. doi: 10.13204/j.gyjzG20051507
Citation: FANG Zhen, XIAO Miaowu, YU Xiaohui, ZHAO Zhicheng. UNDERPINNING REINFORCEMENT TECHNIQUE FOR CONSTRUCTING SUBWAY STATION PASSAGE UNDERPASSING THE EXISTING TUNNEL BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(12): 172-179. doi: 10.13204/j.gyjzG20051507

UNDERPINNING REINFORCEMENT TECHNIQUE FOR CONSTRUCTING SUBWAY STATION PASSAGE UNDERPASSING THE EXISTING TUNNEL BRIDGE

doi: 10.13204/j.gyjzG20051507
  • Received Date: 2020-09-20
    Available Online: 2021-03-31
  • The construction of underground subway stations often has to underpass the existing building structures. However, there is less relevant construction experience underneath the existing tunnel bridges. As smooth traffic needs to be ensured in the existing tunnel bridges, it is very important to ensure the safety of tunnel bridges and quickly restore traffic while constructing subway stations.Taking the construction of Harbin Metro Line 3 Haping Road Station underpassing the Tunnel Bridge of Health Road as an example, the underpinning reinforcement construction technique of the underpass above the station passage was introduced in detail. To examine the reliability of the construction technology, the whole process of the construction of the passage underpassing through the existing tunnel bridge was numerically stimulated to analyze the deformation settlement of the underpinning reinforced tunnel bridge during the excavation construction at the lower station.The analysis results showed that the maximum vertical deformation of the underpinning reinforced tunnel bridge was only 2.35 mm. The maximum stress was 0.210 MPa, which was much smaller than its tensile deformation and strength design value. This proved the reliability of the underpinning reinforcement scheme adopted for the tunnel bridge.
  • loading
  • 严智丹.地铁施工中的桩基托换技术探究[J].住宅与房地产,2017(30):192.
    王世利.托换技术在既有建筑地基加固中的应用[J].城市建设理论研究,2016(21):68-69.
    蔡治奎,解立波.浅埋暗挖隧道内桩基主动托换技术方案可靠性研究[J].铁道建筑技术,2010(6):53-58.
    沈栋.复杂条件下地铁车站施工对邻近建筑物的影响分析[J].施工技术,2018,47(16):21-24

    ,48.
    许有俊,葛绍英,孙凤.盾构隧道下穿地铁车站结构沉降特性研究[J].施工技术,2018,47(7):113-118

    ,123.
    王剑晨,刘运亮.暗挖地铁车站平行下穿既有隧道的变形控制及规律研究[J].铁道学报,2017,39(11):131-137.
    彭海松,于文强,刘永峰,等.桩基托换对隧道结构影响的有限元分析[J].科技周刊,2019(34):103-104.
    李德超,钱建固,吴世明.开挖状态下既有托换桩基变形有限元分析[J].岩土工程学报,2012,34(增刊1):238-242.
    孙沈鹏,陶海灵,龙毅华,等.运营状态下高架桥的立柱托换施工[J].建筑施工,2018,40(1):125-128.
    王梦迟,牛建军,杨智杰.某地铁车站基坑盖挖法施工数值模拟分析[J].路基工程,2017(3):220-224.
    姜忻良,王振军.盾构法隧道施工工序对地表既有铁路的影响分析[J].建筑结构,2013,43(增刊2):96-99.
    郑余朝,仇文革,张俊儒.三管盾构隧道下穿铁路引起的地表位移及其控制技术[J].中国铁道科学,2007(5):65-70.
    季大雪.武汉长江隧道盾构下穿武九铁路沉降影响分析[J].铁道工程学报,2009,26(10):59-63.
    冯超,高志刚.地铁盾构隧道下穿宁启铁路的变形影响规律及控制技术[J].隧道建设,2015,35(10):1015-1021.
    白海卫,王剑晨,刘运亮,等. 既有地下结构受下穿施工影响的力学响应与安全控制研究[J]. 岩土工程学报,2019, 41(5):874-884.
    韩煊,刘赪炜, STANDING J R. 隧道下穿既有线的案例分析与沉降分析方法[J]. 土木工程学报, 2012, 45(1):134-141.
    严小卫,于晓辉, 赵智成, 等. BIM技术在地铁车站下穿既有地道桥施工中的应用研究[J].工程管理学报, 2020, 34(2):90-94.
    任建喜,王东星,王江. 全盖挖法地铁车站基坑及周边变形规律研究[J].铁道工程学报,2016,33(5):82-88.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (86) PDF downloads(7) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return