YOU Ying, ZHANG Zetao, LIU Xuegang, WANG Jun. A SCHEME AND ENGINEERING MONITORING OF EARLY DISMANTLING FOR TEMPORARY SUPPORTS OF A SPATICAL CURVED STEEL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(2): 106-112,129. doi: 10.13204/j.gyjzG20032605
Citation:
YOU Ying, ZHANG Zetao, LIU Xuegang, WANG Jun. A SCHEME AND ENGINEERING MONITORING OF EARLY DISMANTLING FOR TEMPORARY SUPPORTS OF A SPATICAL CURVED STEEL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(2): 106-112,129. doi: 10.13204/j.gyjzG20032605
YOU Ying, ZHANG Zetao, LIU Xuegang, WANG Jun. A SCHEME AND ENGINEERING MONITORING OF EARLY DISMANTLING FOR TEMPORARY SUPPORTS OF A SPATICAL CURVED STEEL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(2): 106-112,129. doi: 10.13204/j.gyjzG20032605
Citation:
YOU Ying, ZHANG Zetao, LIU Xuegang, WANG Jun. A SCHEME AND ENGINEERING MONITORING OF EARLY DISMANTLING FOR TEMPORARY SUPPORTS OF A SPATICAL CURVED STEEL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(2): 106-112,129. doi: 10.13204/j.gyjzG20032605
The early dismantling of temporary supports is a key step in the construction process of most space steel structures. To ensure the smooth progress of the unloading process, it is necessary to conduct a theoretical analysis of the dismantling plan and real-time monitoring of stress and deformation during the dismantling process. The space curved steel structure of the National Cyber Security Talent and Innovation Base Exhibition Center was taken as an example. For this structure with peculiar shapes and the first in China, three dismantling for temporary supports early schemes were proposed for simulation analysis, including one-way successive dismantling, the order of dismantling from the outside to the inside and dismantling from the inside to the outside was simulated and calculated in sequence. The results showed that the structure had the best overall performance when dismantling from the inside to the outside. The stress and deformation data monitored during the actual dismantling process were compared with comparative analysis of theoretical values. The results of stress and deformation changed during actual dismantling were close to the theoretical analysis results. This dismantling scheme was safe and reliable, and could provide a reference for dismantling the temporary supports of similar space steel structures.
DONG L T,PAN J L, YUAN F, et al.Flexural Behaviors of Stell Reinforced ECC/Concrete Composite Beams[J].Journal of Southeast University,2012,28(2):195-202.
HAO Y H,LIU H L,XING Y M,et al.Erosion Wear Surface Morphology and Roughness of Stell Structure Galvanized Coating[J].China Surface Engineering,2017,30(1):56-62.
RAZAQPUR A G,SVECOVA D,CHEUNG M S.Rational Method for Calculating Deflection of Fiber-Reinforced Polymer Reinforced Beams[J].ACI Structural Journal,2000,97(1):175-184.
TIAN L M,HAO J P, ZHENG J, et al.The Analysis of Construction Mechanical Simulation of the Large-Span Steel Structure[C]//Proceedings of the 2009 International Conference on Information Management,Innovation Management and Industrial Engineering.2009:150-153.