[1] | XIA Yun, LIU Weiji, CHEN Chuntao, ZHOU Xiezhong, TANG Hongyuan, TAN Hongfei. Seismic Performance Tests of Prefabricated Shear Walls Connected with Cone-Sleeve Locking of Vertical Steel Bars[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(9): 81-89. doi: 10.3724/j.gyjzG23090720 |
[2] | ZHAO Yongqiang, ZHENG Zhiyuan, ZHANG Pengyuan, ZHANG Yujin, XU Qi, XU Yiming. Experimental Research on Seismic Performance of Prefabricated Concrete Shear Walls with Prefabricated Concrete Infill Walls[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(1): 108-120. doi: 10.13204/j.gyjzG22022114 |
[3] | WU Dongyue, PEND Xiangdong, LU Yinjie, CHEN Wei, WANG Shilin, WANG Xu, FU Qian. Experimental Research on Seismic Performance of Reinforced Tenon Precast Low-Rise Shear Walls[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(7): 72-78. doi: 10.13204/j.gyjzg21070909 |
[4] | PANG Rui, WANG Lu, LIU Yuhao, WANG Yixiao, DING Shusu. Experimental Research on Seismic Performance Test of Prefabricated Steel-Concrete Composite Tube Shear Walls[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(4): 84-90. doi: 10.13204/j.gyjzG20050712 |
[5] | LI Bin, LUO Yanyan, LI Xingbo. Seismic Performance Test and Finite Element Analysis of Monolithic Precast Shear Wall with Partially-Connected Vertical Distributed Steel Bars[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(5): 51-59,23. doi: 10.13204/j.gyjzG21040601 |
[6] | REN Hongwei, QI Fang. EXPERIMENTAL RESEARCH ON SEISMIC PERFORMANCE OF PREFABRICATED SHEAR WALL WITH CONCRETE FILLED STEEL TUBE FRAME UNDER RAPID RECIPROCATING LOAD[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(6): 103-110,116. doi: 10.13204/j.gyjzG20070211 |
[7] | PANG Rui, WANG Yixiao, XU Zhu, WANG Lu, LEI Hongbing. RESEARCH ON SEISMIC PERFORMANCES OF PREFABRICATED SRCT SHEAR WALL STRUCTURE WITH HORIZONTAL CONNECTIONS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(3): 35-41. doi: 10.13204/j.gyjzG20032209 |
[8] | ZHENG Qizhen, LI Huiyan, LONG Libo, CHEN Gang. EXPERIMENTAL RESEARCH ON ASEISMIC PERFORMANCES OF PREFABRICATED SHEAR WALL CONNECTED BY UHPC[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(9): 82-89. doi: 10.13204/j.gyjzG20042601 |
[9] | LYU Yuangui, HU Longping, ZHANG Xiangchao, ZHANG Heng, LI Jianchuang, YU Min, CHI Yin. EXPERIMENTAL STUDY ON SEISMIC PERFORMANCE OF T-SHAPED PREFABRICATED CONCRETE SHEAR WALL CONNECTED WITH A VERTICAL SEAM[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(5): 56-62. doi: 10.13204/j.gyjz201908300010 |
[10] | YANG Zhao, LING Zhihan, YE Jiaolong, LIU Kun, YANG Quan, ZHOU Xin. EXPERIMENTAL STUDY ON ASEISMIC PROPERTIES OF EARTHQUAKE-DAMAGED JOINTS FOR ASSEMBLED MONOLITHIC CONCRETE FRAMES STRENGTHENED WITH CARBON FIBER SHEETS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(7): 185-193. doi: 10.13204/j.gyjzG19121615 |
[11] | WANG Yixiao, PANG Rui, DING Shusu, XU Zhu, WANG Lu, LEI Hongbing. EXPERIMENTAL RESEARCH ON SEISMIC BEHAVIORS OF PREFABRICATED SRCT SHEAR WALLS WITH DIFFERENT DISTANCE TO THICKNESS RATIOS[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(8): 145-153,127. doi: 10.13204/j.gyjzG19102302 |
[12] | WANG Yuliang, CUI Hongjun, ZHANG Yumin, CAI Zhanjun, XU Lixian. EXPERIMENTAL RESEARCH ON SEISMIC BEHAVIOR OF PREFABRICATED SHEAR WALL WITH ENERGY DISSIPATION BY VERTICAL JOINTS[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(11): 46-51. doi: 10.13204/j.gyjzG19102703 |
[13] | Wang Chenggang, Hu Bo, Liu Bingkang, Chen Jian. PSEUDO-DYNAMIC EXPERIMENTAL AND ANALYTICAL STUDY OF TWO-STORY RECYCLED AGGREGATE CONCRETE FRAME[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(10): 50-54,90. doi: 10.13204/j.gyjz201310012 |
[14] | Huang Shenjiang, Liu Bingkang, Ling Qi. SEISMIC BEHAVIOR EXPERIMENT RESEARCHES ON PRESTRESSED FABRICATED PC FRAME CONNECTIONS UNDER PSEUDO DYNAMIC TEST[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(12): 39-43. doi: 10.13204/j.gyjz201112009 |
[15] | Bai Xiaohong, Bai Guoliang. EXPERIMENTAL AND THEORETICAL STUDY ON THE DEFORMATION PROPERTY OF THE FRAME-BENT STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(7): 31-35. doi: 10.13204/j.gyjz201007010 |
[16] | Wang Xinling, Wu Chengxia, Bi Suping. AN EXPERIMENTAL STUDY ON PSEUDO-DYNAMIC TEST OF NOVEL HERRINGBONE BRACES COMPOSITE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 77-81. doi: 10.13204/j.gyjz201002018 |
[17] | Liu Jianwei, Li Yingmin, Yang Zhihong, Xia Hongliu, Shan Liang. COMPARISON OF ASEISMIC BEHAVIOR OF TRADITIONAL AND SANDWICH SPACE RC BEAM-COLUMN JOINTS BASED ON CYCLIC LOAD TEST[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 88-93. doi: 10.13204/j.gyjz200902014 |
[18] | Li Shuchun, Diao Bo, Ye Yinghua, Gao Changzhong, Cui Haihong. SEISMIC BEHAVIOR EXPERIMENT AND DAMAGE ANALYSIS ON RC L-SHAPED COLUMNS SUBJECTED TO CYCLICAL LOADING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(6): 30-34,57. doi: 10.13204/j.gyjz200806010 |
[19] | Nie Jianguo, Chen Ge. PLASTIC ANALYSIS ON COMPOSITE FLOOR SLABS SUBJECTED TO LATERAL LOADS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(8): 18-21. doi: 10.13204/j.gyjz200708005 |
[20] | Ding Yongchun, Qian Yulin, Jiang Jing. STUDY ON COMPOUND CONTROL METHOD OF EARTHQUAKE-RESISTANCE TEST OF STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 6-9,23. doi: 10.13204/j.gyjz200410002 |