Zhan Zhongguo, Yan Kecheng, Yan Wenping. ANALYSIS AND RESEARCH ON REPAIR AND REINFORCEMENT OF ULTRA-DEEP MINE VERTICAL SHAFT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 173-176. doi: 10.13204/j.gyjz201403034
Citation:
Zhan Zhongguo, Yan Kecheng, Yan Wenping. ANALYSIS AND RESEARCH ON REPAIR AND REINFORCEMENT OF ULTRA-DEEP MINE VERTICAL SHAFT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 173-176. doi: 10.13204/j.gyjz201403034
Zhan Zhongguo, Yan Kecheng, Yan Wenping. ANALYSIS AND RESEARCH ON REPAIR AND REINFORCEMENT OF ULTRA-DEEP MINE VERTICAL SHAFT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 173-176. doi: 10.13204/j.gyjz201403034
Citation:
Zhan Zhongguo, Yan Kecheng, Yan Wenping. ANALYSIS AND RESEARCH ON REPAIR AND REINFORCEMENT OF ULTRA-DEEP MINE VERTICAL SHAFT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 173-176. doi: 10.13204/j.gyjz201403034
There is a serious collapse in a mine vertical shaft of a cement factory which can not be used. After synthesis analysis and numerical simulation of 2D finite element,the repair and reinforcement scheme,that the template + steel reinforced concrete lining (internal model method) + bolt (soil nailing block method) + Mn steel casing ( casing follow-up method) is confirmed. The plan have already been carried out,and its feasibility is verified. It is a successful case of mine vertical shaft repair and reinforcement.