Shao Guoxin. THE DESIGN AND CONSTRUCTION OF FREEZING METHOD OF CONNECTED AISLE FOR THE METRO SHIELD TUNNELS IN NINGBO SOFT SOIL STRATUM[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(11): 148-152. doi: 10.13204/j.gyjz201311033
Citation:
Shao Guoxin. THE DESIGN AND CONSTRUCTION OF FREEZING METHOD OF CONNECTED AISLE FOR THE METRO SHIELD TUNNELS IN NINGBO SOFT SOIL STRATUM[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(11): 148-152. doi: 10.13204/j.gyjz201311033
Shao Guoxin. THE DESIGN AND CONSTRUCTION OF FREEZING METHOD OF CONNECTED AISLE FOR THE METRO SHIELD TUNNELS IN NINGBO SOFT SOIL STRATUM[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(11): 148-152. doi: 10.13204/j.gyjz201311033
Citation:
Shao Guoxin. THE DESIGN AND CONSTRUCTION OF FREEZING METHOD OF CONNECTED AISLE FOR THE METRO SHIELD TUNNELS IN NINGBO SOFT SOIL STRATUM[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(11): 148-152. doi: 10.13204/j.gyjz201311033
By means of analysing selection of the location of connected aisles from shield tunnels of a project in soft soil stratum,reinforcing the stratum by freezing method and excavating,etc,and carrying out the numerical simulation calculation,the main measures of controlling the construction risks from the connected aisle during design and construction were summarized. From which good effect was got in construction. It is of some guiding significance to the design and construction of similar projects in the soft soil strata in the future.