Based on a commercial plaza hotel in Yangzhou,it was analyzed in detail the principle of using finite difference method to solve the mass concrete temperature field. Through the establishment of the finite difference method model,it was solved this raft foundation mass concrete temperature field. Meanwhile it was studied the technical measures for thermal control by incorporating WC air-entraining high efficient water reducing agent into mass concrete,using stepped pouring method and respirable structure to mitigate the constraint of the baseplate. The solved results of the mass concrete temperature field were compared with the measured results,they were basically the same.