Li Qingning, Zheng Xianchao, Xu Mingtang, Jiang Weishan, Pan Shubin. EXPERIMENTAL RESEARCH AND THEORETICAL ANALYSIS OF A NEW CONNECTION NODE WITH STEEL PLATE HOOP AND BOLT TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(9): 59-64,87. doi: 10.13204/j.gyjz201309011
Citation:
Li Qingning, Zheng Xianchao, Xu Mingtang, Jiang Weishan, Pan Shubin. EXPERIMENTAL RESEARCH AND THEORETICAL ANALYSIS OF A NEW CONNECTION NODE WITH STEEL PLATE HOOP AND BOLT TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(9): 59-64,87. doi: 10.13204/j.gyjz201309011
Li Qingning, Zheng Xianchao, Xu Mingtang, Jiang Weishan, Pan Shubin. EXPERIMENTAL RESEARCH AND THEORETICAL ANALYSIS OF A NEW CONNECTION NODE WITH STEEL PLATE HOOP AND BOLT TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(9): 59-64,87. doi: 10.13204/j.gyjz201309011
Citation:
Li Qingning, Zheng Xianchao, Xu Mingtang, Jiang Weishan, Pan Shubin. EXPERIMENTAL RESEARCH AND THEORETICAL ANALYSIS OF A NEW CONNECTION NODE WITH STEEL PLATE HOOP AND BOLT TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(9): 59-64,87. doi: 10.13204/j.gyjz201309011
In the paper,the connection with steel plate hoop and bolt tendon between the prefabricated concretemembers was put forward. The 1 ∶ 2 scale test models were made for the low cycle-way repeated loading test toresearch the mechanism and failure modes,and work performance of prefabricated components. The contrast of thetest results with the cast-in-situ components validated that the prefabricated component with the new connection hasthe same bending performance and seismic capacity of the cast-in-place components,and the new connection can beused in assembly connection of the beam and column.