Citation: | Yu Ruqing, Tang Shuoning. A PRELIMINARY STUDY ON THE SUSTAINABLE DEVELOPMENT TECHNIQUE OF THE LONDON OLYMPICS MAIN STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(9): 46-49,115. doi: 10.13204/j.gyjz201309008 |
[2] 闫广军,李静.可持续发展与体育建筑[J].低温建筑技术,2010(1):14-15.
|
张希钊.绿色体育场馆设计方法研究[D].河北:河北工业大学,2008:20-21.
|
[3] Tony Aikenhead.Designing & Constructing the London 2012Olympic Stadium[M].London: London 2012 Sustainability PlanSummary,2010.
|
[4] Ian Crockford,Mike Breton,Fergus McCormick Philip Johnson.Delivering London 2012: the Olympic Stadium:Civil Engineering[M].London: London 2012 Sustainability Plan Summary,2011.
|
[5] London Organising Committee of the Olympic Games andParalympic Games Ltd,Towards a One Planet 2012,London[M].London 2012 Sustainability Plan Summary,2010(5):30-31.
|
[1] 王立红.绿色住宅概论[M].北京:中国环境科学出版社,2003.
|
[2] 刘瑞亮.模糊综合评价在土地利用规划环境影响评价中的应用[J].特区经济,2007(12):57-59.
|
[3] 吴晓强.江苏城乡公共服务一体化评价体系的构建及实证研究[J].特区经济,2011(11):62-63.
|
[4] 梁颖,蔡承智.我国东、中部地区城镇化与新农村建设区域优先序战略探索[J].特区经济,2011(2):46-49.
|
[5] 林敏.新农村绿色建筑发展的思考[J].铁路工程造价管理,2009(5):76-77.
|
[6] GB 503782006 绿色建筑评价标准[S].
|
[7] 成飞燕.城市化进程中的新农村建设问题[J].中国证券期货,2011(3):20-21.
|
[1] | ZHANG Guowei, FENG Yang, QIN Changan, LU Qinggang, LIU Hua. Comparative Study on Autoclaved Aerated Concrete Slab Design in Chinese and European Codes[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(2): 204-210,168. doi: 10.13204/j.gyjzG22041004 |
[2] | GE Yuanhui, LI Yanchang, HAN Liangjun, LI Jun, LIANG Jiadong, WANG Rongqi, ZHA Xiaoxiong. Design Method of Combination Technique for Prefabricated Structure and Self-Resetting Structure[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(5): 60-69,193. doi: 10.13204/j.gyjzG21121407 |
[3] | LIU Zongquan, YUE Qingrui, LI Rong, ZENG Zhaobo, DING Yi. CHARACTERISTICS AND DEVELOPMENT TREND OF STRUCTURAL DESIGN FOR SINGLE BUILDING IN THEME PARKS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(8): 137-140,218. doi: 10.13204/j.gyjzG20122104 |
[4] | Tsai Yufong, Wang Zhu, He Yong. THE GENIUS LOCI OF INDUSTRIAL HERITAGES IN ZECHE ZOLLVEREIN[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(10): 181-183. doi: 10.13204/j.gyjz201410035 |
[5] | Li Jianfen, Wu Dongfeng, Wang Yan. STRUCTURAL DESIGN OF A LONG-SPAN AND ARCHED STEEL CANOPY WITHOUT COLUMN ON PLATFORM IN TAIZHOU RAILWAY STATION[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 168-171. doi: 10.13204/j.gyjz2001411033 |
[6] | Liu Wenyan. STRUCTURAL DESIGN OF A SUPER-HIGH-RISE OFFICE BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(12): 157-162. doi: 10.13204/j.gyjz2001412027 |
[7] | Sun Changling, Wang Zhiyuan. THE EXAMPLE ABOUT THE ADAPTIVE REUSEOF OF AN INDUSTRIAL PLANT[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 168-171. doi: 10.13204/j.gyjz201302034 |
[9] | Lin Jie, Jin Zuquan, Zhuang Qichang. CORROSION INSPECTION AND ANALYSIS OF COASTAL BRIDGE CONCRETE STRUCTURES IN MARINE ENVIRONMENT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(7): 161-165. doi: 10.13204/j.gyjz201207028 |
[10] | Shen Jianming, Wang Junping, Li Mengxiong. BRIEF INTRODUCTION TO STRUCTURAL DESIGN WITH EUROCODES[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(2): 102-107. doi: 10.13204/j.gyjz201102024 |
[11] | Zhang Wei. SUSTAINABLE PRACTICE OF GERMAN ECOVILLAGE:CASE STUDY ON ZEGG[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(10): 41-44,5. doi: 10.13204/j.gyjz201010010 |
[12] | Guo Meng, Shi Linkai. STUDY ON STRUCTURAL DESIGN OF SPECIAL-SHAPED FRAME[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(6): 70-73. doi: 10.13204/j.gyjz200906017 |
[13] | Wang Zeqiang, Qin Jie, Li Guoli, Chen Xinli, Ge Jiaqi. THE STRUCTURAL DESIGN AND CONSTRUCTION OF THE SUSPENDED-CABLE STRUCTURE FOR THE DAY-LIGHTING CEILING OF JINSHA SITE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 26-29. doi: 10.13204/j.gyjz200812008 |
[14] | Tang Xingrong, Mao Xiaoyong, Gu Qiang, Yu Anlin. STRUCTURAL DESIGN OF MEGA SPATIAL STEEL TUBE ELLIPTICAL ARCH[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(6): 92-95,29. doi: 10.13204/j.gyjz200806024 |
[15] | Zhang Jianrong, Liu Zhaoqiu, Hua Yijie. RESEARCH ON TEMPERATURE EFFECT COMBINATION IN THE DESIGN OF CONCRETE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 42-46,11. doi: 10.13204/j.gyjz200701012 |
[16] | Liu Hong-hong, Liao Li-jun. PLANNING AND DESIGN OF GUANGZHOU LIKENG POWER PLANT BY INCINERATING REFUSES[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(11): 16-19,31. doi: 10.13204/j.gyjz200711005 |
[17] | Liu Zheng, Sun Jun, Wang Hai-ying. STRUCTURAL DESIGN AND SAFETY OF CONCRETE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 46-49,32. doi: 10.13204/j.gyjz200605014 |
[18] | Wang Haizhong, Zhao Tianyu. STRUCTURAL DESIGN AND MODES OF FAILURE ANALYSIS OF SANDWICH PANELS[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(8): 97-99,120. doi: 10.13204/j.gyjz200508024 |
[19] | Wu Xiaowei, Pan Qi, Yu Changhai, Lu Daqing. STRUCTURAL DESIGN OF OFFICE BUILDING FOR YINZHOU BANK[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(6): 39-40,44. doi: 10.13204/j.gyjz200506011 |
[20] | Wu Qing, Hao Yamin. THE STRUCTURE DESIGN AND CONSTRUCTION OF THE NEW LEIFENG PAGODA[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 19-22. doi: 10.13204/j.gyjz200412005 |