[1] | LIU Weiran, GUO Shida, FANG Bin, YU Haifeng, WANG Jiawei, GAO Renqing, YE Xihao, HAN Jiantian. Research on the Mechanical Properties of Steel Truss Support Platform During the Construction of the Roof of a Large-Scale Silo[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(2): 263-270. doi: 10.3724/j.gyjzG22031614 |
[2] | HUANG Xigui, LUO Shengchang, LI Lixiao. Research on Wind Speed Profile Characteristics of Typhoon Boundary Layer Based on Measured Data[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(2): 98-105. doi: 10.3724/j.gyjzG23121101 |
[3] | LIANG Yan, WEI Yingying, FENG Haoqi, ZHAO Ming, GUO Jing. Simulation Analysis on Construction Processes of Long-Span and Complex Steel Frames with Inclined Pillars[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(2): 75-80. doi: 10.13204/j.gyjzG201902180009 |
[4] | AN Daoyao. Safety Limit Analysis for the Whole Construction Process of a Super High-Rise Building Under Strong Earthquakes[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(3): 117-122. doi: 10.13204/j.gyjzG21062921 |
[5] | GAO Peng, GE Changwen, LIU Maofang, MENG Lei, YIN Zongcheng, WANG Zhiqiang, GAN Zhengyong, YANG Xuan, ZHU Jie. Numerical Analysis of Crack Resistance of Concrete Structure of Ultra-Long Round Stadium During Construction[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 94-99,110. doi: 10.13204/j.gyjzG22073006 |
[6] | ZHOU Yan-ling, CAO Da-fu, WANG Kun, GE Wen-jie, LIU Jia-qi. Analysis of Creep Effect of Prestressed Concrete Continuous Beam Bridge in Construction Process[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(9): 101-107. doi: 10.13204/j.gyjzg21060914 |
[7] | Huo Runke, Li Maoda, Li Jing, Wang Qiang, Yan Jirui. NUMERICAL SIMULATION AND ANALYSIS OF TUNNEL CONSTRUCTION PROCESS OF UNSYMMETRICAL TUNNEL IN SOFT ROCK[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(2): 95-100. doi: 10.13204/j.gyjz201502021 |
[8] | Hu Changming, Liu Fengyun, Yang Jianhua, Zhao Yunbo, Ren Wenjun, Cai Suping. ON-SITE MEASUREMENT AND ANSYS ANALYSIS OF CANTILEVER[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(4): 136-142. doi: 10.13204/j.gyjz201504026 |
[9] | Zheng Lianqiong, Cai Xuefeng, Zhuang Jinping, Zhou Jizhong, Tuo Mingbei. ON-SITE MEASUREMENT AND ANALYSIS OF SUPER HIGH OR LARGE-SPAN FORMWORK SUPPORT WITH FASTENER STEEL TUBE[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(7): 96-100. doi: 10.13204/j.gyjz201307022 |
[10] | Xiong Xueyu, Cheng Chen, Li Yuan, LüPin. STUDY ON THE CONSTRUCTION PROCESS OF PRESTRESSED CONCRETE FRAME TAKING ACCOUNT OF THE IMPACT OF THE SECONDARY INTERNAL FORCE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(12): 12-15. doi: 10.13204/j.gyjz201112003 |
[11] | Zhuang Jinping, Cai Xuefeng, Lin Zengzhong, Zhou Jizhong, Lin Huaqiang. SITE MEASUREMENT AND DISCUSSION ON MODIFYING METHOD OF BEARING CAPACITY FORMULA OF SUPER HIGH OR LARGE-SPAN FORM STRUT SYSTEM[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(9): 94-99. doi: 10.13204/j.gyjz201109021 |
[12] | Hu Changming, Zeng Fankui, Wang Jing, Wang Xia. INFLUENCE OF GENERALIZED INITIAL IMPERFECTIONS ON STEEL CONSTRUCTION CONNECTED WITH FASTENERS[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 17-19,27. doi: 10.13204/j.gyjz201002004 |
[13] | Zeng Fankui, Hu Changming, Ge Zhaoshen, Yan Xin. STUDY ON VALUE OF EFFECTIVE LENGTH COEFFICIENT OF UPRINGT STANCHION OF COUPLER STEEL TUBE FALSEWORK[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 24-27. doi: 10.13204/j.gyjz201002006 |
[14] | Wang Xin, Yang Shirong, Feng Yonggang. THE ON-SITE TEST OF PUMPING PRESSURE OF CONCRETE-FILLED STEEL TUBE PUMPING[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 98-101. doi: 10.13204/j.gyjz200912024 |
[15] | Zheng Jiang, Hao Jiping, Li Cunliang, Yang Xiaoli, Wang Xiantie, Liu Shaowen. MECHANICS EMULATION AND ANALYSIS OF THE HESHI STUPA OF FAMEN TEMPLE DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(10): 90-95. doi: 10.13204/j.gyjz200910022 |
[16] | Liu Xuewu, Guo Yanlin, Zhang Qinglin, Liu Luyu. ANALYSIS OF INTERNAL FORCE AND DEFORMATION FOR THE NEW CCTV HEADQUARTERS DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(9): 22-29. doi: 10.13204/j.gyjz200709004 |
[17] | Mao Jinping, Xu Wei. RELIABILITY ANALYSIS OF ROCK- SOCKETED SUPPORT STRUCTURES WITH REAL- TIME DEFORMATION CONTROL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(2): 42-44. doi: 10.13204/j.gyjz200602013 |
[18] | Liu An-jun, Gong Xiao-nan, Qian Guo-zhen. A NONLINEAR ANALYSIS OF COMBINED ACTIONS OF SOIL ANCHORS AND EARTH-RETAINING PILE WALL IN CONSIDERATION OF CONSTRUCTION STEPS[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 74-78. doi: 10.13204/j.gyjz200605020 |
[19] | Wang Yingge. FIELD TEST AND NUMERICAL ANALYSIS OF INTERACTION OF PILE- RAFT FOUNDATION ULTRA - HIGH TUBE-IN-TUBE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 10-15. doi: 10.13204/j.gyjz200505003 |
[20] | Guo Yanlin, Cui Xiaoqiang. KEY TECHNICAL PROBLEMS AND DISCUSSION IN CONSTRUCTION PROCESS OF LARGE SPAN STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 1-5,22. doi: 10.13204/j.gyjz200412001 |