Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 43 Issue 2
Dec.  2014
Turn off MathJax
Article Contents
Wang Xiang, Zhang Feilin, Xiao Nan. LESSONS OF REMOVING FORMWORK AHEAD OF TIME UNDER THE CONSTRUCTION OF POST-CAST STRIP IN RC STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 159-163. doi: 10.13204/j.gyjz201302032
Citation: Wang Xiang, Zhang Feilin, Xiao Nan. LESSONS OF REMOVING FORMWORK AHEAD OF TIME UNDER THE CONSTRUCTION OF POST-CAST STRIP IN RC STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 159-163. doi: 10.13204/j.gyjz201302032

LESSONS OF REMOVING FORMWORK AHEAD OF TIME UNDER THE CONSTRUCTION OF POST-CAST STRIP IN RC STRUCTURES

doi: 10.13204/j.gyjz201302032
  • Received Date: 2012-04-25
  • Publish Date: 2013-02-20
  • When designing structures,engineers should pay attention to various structural changing that may arise in the construction process.Construction enterprises should do their work strictly according to relevant laws and regulations.In the construction process of a shopping mall,the provisional supports on both sides of post-cast strip were removed earlier than required in order to improve the utilization of molds,which caused floor sinking deflection up to about 9 cm.Finite element software ANSYS was used for simulation of the process in which the reinforcement across the post-cast strip was modeled as link element.The finite element model of structure without support between adjacent floors was made.After analysis and calculation,the damaged parts of the structure were located,and the maximum deflection of prediction was 11 cm or so,which was consistent with the actual structure.Furthermore,the capacities of the structure with the existing geometry were analyzed for afterwards strengthening after closing the post-cast strip.
  • loading
  • [2] 赵军,杨绿峰.钢筋混凝土框架结构施工力学分析[J].广西大学学报:自然科学版,2011,36(1):59-63.
    赵军.钢筋混凝土结构施工期可靠性分析[D].广西大学,2009.
    [3] 徐伟杰.谈后浇带的设计与施工[J].工业建筑,2007,37(增刊):1057-1058,1040.
    [4] 陈修富.后浇带施工技术[J].施工技术研究与应用,2006(1):43-44.
    [5] 刘兆祥.混凝土结构后浇带的设置与施工[J].兰州工业高等专科学校学报,2009,16(4):50-53.
    [6] 郑立标.浅谈混凝土后浇带的施工和应用[J].中国房地产业,2011(7):300-301.
    [7] 葛玉林.从梁、板结构受力变化分析谈后浇带的模板拆除及解决措施[J].江苏建筑,2010(4):71-72.
    [8] 吴银华,陶莉.关于后浇带施工过程存在的问题及解决措施[J].浙江建筑,2006,23(5):27-29.
    [9] 戴冰法.确保后浇带施工质量的注意事项[J].福建建筑,2007(12):63-64.
    [10] 东南大学,同济大学,天津大学.混凝土结构与砌体结构设计[M].北京:中国建筑工业出版社,2004.
    [11] GB500102010混凝土结构设计规范[S].
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (134) PDF downloads(116) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return