Hu Changming, Wang Jie, Li Jiatao, Liu Fengyun. THE FULL ANALYSIS OF HIGH SUPPORT SYSTEM FOR FORMWORK DURING THE CONSTRUCT OF THE ROOF[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 88-93,133. doi: 10.13204/j.gyjz201302018
Citation: Hu Changming, Wang Jie, Li Jiatao, Liu Fengyun. THE FULL ANALYSIS OF HIGH SUPPORT SYSTEM FOR FORMWORK DURING THE CONSTRUCT OF THE ROOF[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 88-93,133. doi: 10.13204/j.gyjz201302018

THE FULL ANALYSIS OF HIGH SUPPORT SYSTEM FOR FORMWORK DURING THE CONSTRUCT OF THE ROOF

doi: 10.13204/j.gyjz201302018
  • Received Date: 2012-06-27
  • Publish Date: 2013-02-20
  • To explore the characteristics of high support system of formwork during the process of pouring concrete,an underground club in Xi'an was chosen as research object.While pouring concrete,the electrical measuring method was used to measure the stress of steel pipe in high support system and the measured results were compared with the results simulated by finite element analysis software ANSYS.The results showed that the pouring sequence of concrete had a great impact on axial force trends and the location of the maximum axial force.What's more,in the calculation of the overall stability of high support system for formwork,imaginary horizontal force should be used.To improve the security of the formwork support system,the erection program of high support system and the pouring sequence of concrete should be determined based on the analysis of finite element of high support system for formwork.
  • loading
  • [2] 袁雪霞,金伟良,鲁征,等.扣件式钢管支模架稳定承载能力研究[J].土木工程学报,2006,39(5):43-50.
    胡长明,曾凡奎,王静,等.广义初始缺陷对模板支架稳定性的影响[J].工业建筑,2010,40(2):17-20.
    [3] 庄金平,蔡雪峰,林曾忠,等.超高大跨模板支撑体系现场实测及承载力公式修正方法探讨[J].工业建筑,2011,41(9):94-99.
    [4] 谢楠.混凝土浇筑期高大模板支架工作状态的试验测试[J].工程力学,2011,28(增刊1):85-89.
    [5] 覃建建,车佳玲,董攀,等.双向荷载作用下扣件式钢管模板支架稳定性分析[J].工业建筑,2010,40(2):47-50.
    [6] Tayakorn Chandrangsu, Kim J R. Rasmussen. Investigation ofGeometric Imperfections and Joint Stiffness of Support ScaffoldSystems[J]. Journal of Constructional Steel Research,2011,64(4):567-584.
    [7] 胡长明,董攀,沈勤,等.扣件式钢管高大模板支架整体稳定试验研究[J].施工技术,2009,38(4):70-72.
    [8] 林璋璋,杨俊杰.多层模板支撑体系的实测分析[J].施工技术,2005,34(3):20-23.
    [9] 谢楠,王勇.超高模板支架的极限承载能力研究[J].工程力学,2008,25(增刊1):148-152.
    [10] 葛召深,胡长明,王静,等.扣件式钢管模板支架剪刀撑研究[J].施工技术,2009,38(8):62-65.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (176) PDF downloads(59) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return