Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 42 Issue 12
Dec.  2014
Turn off MathJax
Article Contents
Wang Jiaquan, Zhu Cunjin, Li Lei. QUALITY TEST AND DEFECT TREATMENT OF PERCUSSION DRILLING BORED PILE IN KARST AREAS[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(12): 146-150. doi: 10.13204/j.gyjz201212032
Citation: Wang Jiaquan, Zhu Cunjin, Li Lei. QUALITY TEST AND DEFECT TREATMENT OF PERCUSSION DRILLING BORED PILE IN KARST AREAS[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(12): 146-150. doi: 10.13204/j.gyjz201212032

QUALITY TEST AND DEFECT TREATMENT OF PERCUSSION DRILLING BORED PILE IN KARST AREAS

doi: 10.13204/j.gyjz201212032
  • Received Date: 2012-08-20
  • Publish Date: 2012-12-20
  • Combining with the case of percussion drilling bored piles for tall buildings in Guangxi karst area,it was analyzed the factors influencing the quality of such piles in the karst area and detection methods and comprehensively compared the advantages and disadvantages of low strain reflection wave method,ultrasonic transmission method and the drilling pumping core.According to the different situation of percussion drilling bored piles,it was put forward how to comprehensively use the different combinations of low strain reflected wave method,ultrasonic transmission method and borehole core,it was carried out testing and analysis of the quality of punching perfusion pile located in karst zone.In addition,According to the defective piles,it was put forward effective treatment plan of high pressure grouting method,and the treated piles were detected using ultrasonic detector test again,the effect was ideal.
  • loading
  • Cameron G,Chapman T.Quality Assurance of Bored PileFoundations[J].Ground Engineering,2004,37(2):35-40.
    [2] 曹净,赵党书.钻孔灌注桩后压浆最大压力分析[J].工业建筑,2008,38(S1):767-769.
    [3] 虞子平,李东云,金铮,等.基于低应变反射波法分析基桩缺陷[J].土工基础,2009,23(3):86-88.
    [4] 于忆骅,古松,姚勇.超声波透射法在灌注桩缺陷检测中的应用[J].路基工程,2010(3):175-176.
    [5] 段刚,李明.浅谈钻孔灌注桩桩侧桩底联合后压浆技术的工程应用[J].岩土工程界,2006,9(9):36-36.
    [6] 张忠苗,吴世明,包风.钻孔灌注桩桩底后注浆机理与应用研究[J].岩土工程学报,1999,21(6):681-686.
    [7] 赵佩胜,于亮等.钻孔灌注桩桩底沉渣压浆处理技术[J].地下空间与工程学报,2009,5(1):129-132.
    [8] 李典庆,吴帅兵,周创兵.基于贝叶斯理论的灌注桩多个缺陷统计特性分析[J].岩土力学,2008,29(9):2493-2497.
    [9] 白双喜.岩溶地质钻孔桩施工技术[J].山西建筑,2009,35(21):91-93.
    [10] 周秋燕,曾毅学.载体桩在岩溶地区某工程中的应用[J].建筑结构,2011,41(3):98-99.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (73) PDF downloads(107) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return