Zeng Zhao-bo, Chen Xiao-dong, Liu Yuan-yuan, Wang Ying, Deng Xiao-fang. THE APPLICATION OF MODERN INFORMATION TECHNOLOGY IN THE PROJECT INFORMATION MANAGEMENT OF SINGAPORE UNIVERSAL STUDIO PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 39-41. doi: 10.13204/j.gyjz201209009
Citation:
Zeng Zhao-bo, Chen Xiao-dong, Liu Yuan-yuan, Wang Ying, Deng Xiao-fang. THE APPLICATION OF MODERN INFORMATION TECHNOLOGY IN THE PROJECT INFORMATION MANAGEMENT OF SINGAPORE UNIVERSAL STUDIO PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 39-41. doi: 10.13204/j.gyjz201209009
Zeng Zhao-bo, Chen Xiao-dong, Liu Yuan-yuan, Wang Ying, Deng Xiao-fang. THE APPLICATION OF MODERN INFORMATION TECHNOLOGY IN THE PROJECT INFORMATION MANAGEMENT OF SINGAPORE UNIVERSAL STUDIO PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 39-41. doi: 10.13204/j.gyjz201209009
Citation:
Zeng Zhao-bo, Chen Xiao-dong, Liu Yuan-yuan, Wang Ying, Deng Xiao-fang. THE APPLICATION OF MODERN INFORMATION TECHNOLOGY IN THE PROJECT INFORMATION MANAGEMENT OF SINGAPORE UNIVERSAL STUDIO PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 39-41. doi: 10.13204/j.gyjz201209009
Tense duration and rapid transfer of engineering material resulted in a lot of cross work and complicated problems in Singapore Universal Studio Project.There are a lot of work coordination information from different levels continuously, which make higher requirement to the job of information management.So, the key to ensure the project's success is to build an unimpeded and effective system for information transfer, as well sharing and dealing with information scientifically.It is told in detail the development, application and main function of the information system in Singapore Universal Studio Project, which will offer a guidance for other information management of the follow-up projects in the future.