Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 42 Issue 8
Dec.  2014
Turn off MathJax
Article Contents
Zhang Kaichen, Xu Gang, Qian Yingxin, Wang Feng. SIMULATION ANALYSIS OF THE REVERSED CONSTRCTION AND PRESTRESSING OF THE MAIN BUILDING OF GUANGZHOU NEW RAILWAY STATION[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 93-96. doi: 10.13204/j.gyjz201208020
Citation: Zhang Kaichen, Xu Gang, Qian Yingxin, Wang Feng. SIMULATION ANALYSIS OF THE REVERSED CONSTRCTION AND PRESTRESSING OF THE MAIN BUILDING OF GUANGZHOU NEW RAILWAY STATION[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 93-96. doi: 10.13204/j.gyjz201208020

SIMULATION ANALYSIS OF THE REVERSED CONSTRCTION AND PRESTRESSING OF THE MAIN BUILDING OF GUANGZHOU NEW RAILWAY STATION

doi: 10.13204/j.gyjz201208020
  • Received Date: 2012-04-06
  • Publish Date: 2012-08-20
  • The main building of Guangzhou Railway Station was built with complex structural system, its lower partstructure is railway bridge, and the middle part structure is large-span prestressed concrete frame structure, and theroof is large-span prestressed steel structure.To meet the schedule requirements, reversed constrution was applied.The steel roof structures were constructed first, and then the rail beams, drop-off platform and overhead floor.Thisprogram finally saved 45 to 60 d for installation of the steel structure, V beam structure and 21 meter floor.In order toinvestigate the impact on the roof prestressed steel structure of the reversed construction and prestressing of theconcrect, the integral model was built, and construction simulation was conducted, and the results were compared withthose of one time loading simulation.A reliable theoretical basis was provided a for making the prestressing programfor prestressed steel and prestressed concrete, which provided a reference for smooth construction of the project.
  • loading
  • [2] 曾昱,马洪春,任军.广州新客站钢结构工程设计与施工[J].钢结构,2009,24(8):78-80.
    盛平,柯长华,甄伟,等.广州新客站结构总体设计[J].建筑结构,2009,39(12):291-299.
    [3] 刘岩,盛平.广州新客站高架候车层的设计与施工[J].建筑施工,2010,32(11):1145-1150.
    [4] 王永贵,魏永生.广州南站站房钢结构预应力索拱桁架施工[J].建筑机械化,2011,32(1):66-68.
    [5] 徐福江,盛平,柯长华.逆作法施工对广州新客站主站房结构设计的影响[J].建筑结构,2009,39(12):52-54.
    [6] 北京迈达斯技术有限公司.MIDAS技术手册[M].北京:北京迈达斯技术有限公司,2004.
    [7] 黄炜一,顾炜.苏州火车站改造工程预应力梁监测[J].工业建筑,2009,39(增刊):336-345.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (75) PDF downloads(104) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return