Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 42 Issue 7
Dec.  2014
Turn off MathJax
Article Contents
Huang Junjie, Su Qian, Zhou Heng, Zheng Jianbin. REINFORCEMENT DESIGN OF THE DISEASE PILE FOUNDATION OF EXISTING BRIDGE IN KARST AREA AND NUMERICAL ANALYSIS[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(7): 166-170. doi: 10.13204/j.gyjz201207029
Citation: Huang Junjie, Su Qian, Zhou Heng, Zheng Jianbin. REINFORCEMENT DESIGN OF THE DISEASE PILE FOUNDATION OF EXISTING BRIDGE IN KARST AREA AND NUMERICAL ANALYSIS[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(7): 166-170. doi: 10.13204/j.gyjz201207029

REINFORCEMENT DESIGN OF THE DISEASE PILE FOUNDATION OF EXISTING BRIDGE IN KARST AREA AND NUMERICAL ANALYSIS

doi: 10.13204/j.gyjz201207029
  • Received Date: 2011-11-17
  • Publish Date: 2012-07-20
  • The settlement and inclination of the pier of existing railway bridge is caused by the upper long-term load, which has been affected the running safety. Geological exploration found that a large karst cave is located under thebridge pier foundation. Based on the catastrophe theory, according to the instability conditions of cave roofs thebearing capacity of the original piles was calculated. On this basis, consolidation strengthening was required for thefoundation by using the method of adding piles and enlarging bearing platform, according to the distribution of karstcave and the geological characteristics. And the proper length of adding piles was provided by theoretical calculation.What is more, the relationship between the length of adding piles and the settlement and inclination of the pier wasanalyzed, based on the numerical simulation software. The results showed that the numerical calculation resultsagreed with those of theoretical calculation. The bearing capacity of the original bridge pier foundation could not meetthe design requirements. The proper length of adding piles was 1 4. 5 m. The settlement and the maximum settlementdifference in lognitudinal direction of the bearing platform with the proper length of adding piles was 6. 9 mm and0. 89 mm respectively under the upper loads.
  • loading
  • [2] 郭建通,刘建焱,郭辉,等.体外预应力技术在桥梁加固中的应用[J].工业建筑,2002,32(9):69-71.
    贺玉龙,杨立中,郭永春.南昆线西街口-罗平段病害及防治建议[J].铁道建筑,2002(1):9-11.
    [3] 陈飞,黄晓琴.注浆技术在岩溶地层钻孔灌注桩中的应用[J].工业建筑,2008,38(增刊):891-894.
    [4] 肖巍兵,徐德新,陈跃庆,等.基于耐久性等级评定桥梁加固前与加固后的剩余使用寿命探讨[J].工业建筑,2009,39(5):84-88.
    [5] 陈红梅.钢筋混凝土桥梁病害分析及其维修加固[D].大连:大连理工大学,2011.
    [6] 赵明华,蒋冲,曹文贵.岩溶区嵌岩桩承载力及其下伏溶洞顶板安全厚度的研究[J].岩土工程学报,2007,29(11):1618-1622.
    [7] 双德斯P T.突变理论入门[M].凌复华,译.上海:上海科学技术文献出版社,1983.
    [8] Thompson J M T,Shamrock P A.Hyperbolic Umbilici Catastrophein Crystal Fracture[J].Nature,1976(26):598-599.
    [9] Carpentaria Alberto,Catastrophe A.Theory Approach to FractureMechanics[J].Int J Frac,1990(44):57-69.
    [10] TB10002.12005铁路桥涵设计基本规范[S].
    [11] GB500092001建筑结构荷载规范[S].
    [12] 黎斌,范秋雁,秦凤荣.岩溶地区溶洞顶板稳定性分析[J].岩石力学与工程学报,2002,21(4):532-536.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (117) PDF downloads(69) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return