Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 42 Issue 4
Dec.  2014
Turn off MathJax
Article Contents
Wu Quanke, Wu Tiansheng, Lin Chao. CONSTRUCTION TECHNOLOGY RESEARCH ON RECTIFYING DEVIATION AND DOWN RESISTANCE REDUCTION OF MUD BALANCED PIPE- JACKING WITH LARGE- DIAMETER AND LONG- DISTANCE IN SOFT SOIL[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(4): 107-112. doi: 10.13204/j.gyjz201204023
Citation: Wu Quanke, Wu Tiansheng, Lin Chao. CONSTRUCTION TECHNOLOGY RESEARCH ON RECTIFYING DEVIATION AND DOWN RESISTANCE REDUCTION OF MUD BALANCED PIPE- JACKING WITH LARGE- DIAMETER AND LONG- DISTANCE IN SOFT SOIL[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(4): 107-112. doi: 10.13204/j.gyjz201204023

CONSTRUCTION TECHNOLOGY RESEARCH ON RECTIFYING DEVIATION AND DOWN RESISTANCE REDUCTION OF MUD BALANCED PIPE- JACKING WITH LARGE- DIAMETER AND LONG- DISTANCE IN SOFT SOIL

doi: 10.13204/j.gyjz201204023
  • Received Date: 2011-12-22
  • Publish Date: 2012-04-20
  • Based on the Asian Games engineering pipe-jacking construction,key construction technologies were systematically analyzed and researched from mud balance pipe-jacking of reinforced concrete pipe with large-diameter and long-distance in soft soil,including high precision rectifying deviation,resistance reduction by efficient grouting, pipe-jacking construction,monitoring and measurement,etc. Using infrared tracking and positioning technology,with the help of deviation chart correction method,it was done the correction timely and efficiently,ensuring the direction of the route and elevation of high precision. Using the good performance of bentonite and new polymer,high expansion rate of the grouting material,it was modified grouting technology,thus changing the sliding friction into rolling friction. The frictional resistance and total jacking force were reduced by about 43%,the number of relay was reduced. These difficulties were solved by the construction technologies and control methods finally,obtaining excellent economic and social benefits.
  • loading
  • 蒋文路. 顶管工程施工中关键性技术环节的控制[D]. 合肥:合肥工业大学,2009.
    [2] 杨烨旻. 顶管施工注浆作用及环境效应研究[D]. 上海:上海交通大学,2010.
    [3] 魏纲,吴华君,陈春来. 顶管施工中土体损失引起的沉降预测[J]. 岩土力学,2007(2):149-153.
    [4] 杨太华,郑庆华. 越江电力管道泥水顶管法施工关键技术[J].工业建筑,2008,38(增刊):950-953.
    [5] 毛海和. 顶管矩形工作井复合式后背墙反力分布研究[J]. 岩土力学,2007(6):149-153.
    [6] 卢耀栋. 砂卵石地层顶管施工技术及纠偏措施[J]. 施工技术,2007(9):93-94,103.
    [7] 杨太华,邹长中,周松. 复兴东路隧道工程大型泥水平衡盾构施工技术[J]. 上海建设科技,2004(1):23-24.
    [8] 叶方舟. 某引水管顶管法施工方案探讨[J]. 武汉大学学报:工学版,2007(S1):337-340.
    [9] 蒲吉见. 市政道路污水管顶管施工技术[J]. 路基工程,2007(4):146-148.
    [10] 邹碧海,刘先锋,陈德贵. 重庆市主城排水工程 D 干管二级管道工程顶管施工探讨[J]. 工业建筑,2009,39(增刊):1038-1042.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (162) PDF downloads(133) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return