Yang Tao, Yan Yieqiang, Li Guowei. THE SETTLEMENT RATE STANDARD FOR EQUAL PRELOADING BASED ON HYPERBOLIC FITTING METHOD[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(3): 93-96. doi: 10.13204/j.gyjz201203020
Citation: Yang Tao, Yan Yieqiang, Li Guowei. THE SETTLEMENT RATE STANDARD FOR EQUAL PRELOADING BASED ON HYPERBOLIC FITTING METHOD[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(3): 93-96. doi: 10.13204/j.gyjz201203020

THE SETTLEMENT RATE STANDARD FOR EQUAL PRELOADING BASED ON HYPERBOLIC FITTING METHOD

doi: 10.13204/j.gyjz201203020
  • Received Date: 2011-08-09
  • Publish Date: 2012-03-20
  • Based on hyperbolic fitting method,two equations describing the relationship between the settlement rate and the residual settlement,and that between the residual settlement and the post-construction settlement,were established.The settlement rate standard and the unloading time prediction method under the conditions of equal loading were proposed.These formulas reveal that settlement rate was directly proportional to square of residual settlement,the ratio of post-construction settlement to the residual settlement depended on not only the consolidation rate of soil,but also the preloading duration with equal loading and the design working life of pavement,but the preloading duration had little effect on the settlement rate standard.Allowed settlement rates were a power function of the controlled post-construction settlements.An analysis of a case history showed that the settlement rate standards provided by the technical specifications and some local engineering experiences were suitable only for the embankment behind abutment,it took too long reloading time for the standards to be applied to common embankment and the embankment adjacent to structures such as culvert.
  • loading
  • 公路路基设计规范[S].2004.
    刘吉福,陈新华. 应用沉降速率法计算软土路堤剩余沉降[J].岩土工程学报,2003,(02):233-235.
    刘吉福,莫海鸿. 对沉降速率法确定卸载时机的认识[J].岩石力学与工程学报,2007,(增1):3065-3072.
    钟才根,张序. 高速公路软基路堤沉降速率控制[J].苏州城建环保学院学报,2001,(04):48-53.
    陈道志,陈东升. 软土路基超载设计与卸荷时机的确定[J].中南公路工程,2004,(01):66-69.
    张长生,张伯友,刘国楠. 应用沉降速率推算剩余沉降及卸载时间[J].地球科学与环境学报,2005,(04):28-32.
    杨涛,李国维. 公路软基超载预压卸荷时间确定的沉降速率法研究[J].岩土工程学报,2006,(11):1942-1946.
    杨涛,周有成,李聪. 公路软基超载预压卸荷沉降速率标准研究[J].工业建筑,2009,(12):70-73.
    公路软土地基路堤设计与施工技术规范[S].1996.
    李国维,杨涛,宋江波. 公路软基沉降双曲线预测法的进一步探讨[J].公路交通科技,2003,(01):18-20.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (85) PDF downloads(55) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return