Yuan Jianbin, Fang Yingguang. MONITORING OF THE OPEN-CUT SECTION OF A CABLE TUNNEL IN GUANGZHOU[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(2): 111-114. doi: 10.13204/j.gyjz201202025
Citation: Yuan Jianbin, Fang Yingguang. MONITORING OF THE OPEN-CUT SECTION OF A CABLE TUNNEL IN GUANGZHOU[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(2): 111-114. doi: 10.13204/j.gyjz201202025

MONITORING OF THE OPEN-CUT SECTION OF A CABLE TUNNEL IN GUANGZHOU

doi: 10.13204/j.gyjz201202025
  • Received Date: 2011-11-21
  • Publish Date: 2012-02-20
  • Combined with the monitoring example of the open-cut section of a cable tunnel for Houde Substation in Guangzhou,the monitoring safety design and instrument layout were introduced in the system of steel sheet pile and steel struts structure.The monitoring frequency,alertness values and reports etc were presented.According to the analysis and forecast of monitoring data especially the unusual ones,monitoring result was researched to adopt countermeasures,and safety precautions were adopted in time,hence the safety of the field and environment could be ensured.
  • loading
  • GJB 02-1998.广州基坑支护技术规定[S].
    JGJ/T 8-1997.建筑变形测量规程[S].
    马健. 超大深基坑支护方案设计及施工监测[J].工业建筑,2010,(09):97-100.
    GB 50007-2002.建筑地基基础设计规范[S].
    陈忠汉,黄书秩,程丽萍. 深基坑工程[M].北京:机械工业出版社,1999.
    潘泓,曹洪. 广州猎德大桥钢板桩围堰的设计与监测[J].岩石力学与工程学报,2009,(11):2242-2248.
    骆冠勇,曹洪,潘泓. 新光大桥桥墩钢板桩围堰的优化设计与监测[J].华南理工大学学报(自然科学版),2006,(02):124-129.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (100) PDF downloads(73) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return