[1] | JIANG Ziqin, CHEN Panqi, WANG Shuai, WANG Wei, WANG Lijun. Research on Static Properties of Steel Frames with Self-Centering Column Base Joints[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(8): 70-77. doi: 10.3724/j.gyjzG24050701 |
[2] | ZHANG Ailin, ZHANG Xuefeng, JIANG Ziqin, QIU Ping, LIU Xuechun. Research on Flexural Performance of T-Shaped Steel Joints with Cover Paltes for Prefabricated Reticulated Shells[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(1): 68-75. doi: 10.3724/j.gyjzG23020714 |
[3] | DU Wei, WANG Wenfu, FANG Minjie, ZHOU Hua, WEI Hua, WANG Qinghe. Design Methods for Static Performance of Steel-Bars Truss Slabs Considering Effects of Profiled Steel Sheets[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(6): 153-160. doi: 10.13204/j.gyjzG22110911 |
[4] | SHENG Yongjun. RESEARCH ON MECHANICAL PROPERTIES OF STEEL-CONCRETE COMPOSITE BEAMS WITH HIGH-STRENGTH BOLT CONNECTORS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(9): 121-126. doi: 10.13204/j.gyjzG21061514 |
[5] | Lin Shikai Cheng Xiaoyan Xiong Liang Du Xinxi Ke Rui, . EXPERIMENTAL STUDY OF STATIC PERFORMANCE OF TRUSS TRANSMISSION TOWER OF GLASS FIBER REINFORCED POLYMER[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(6): 165-168. doi: 10.13204/j.gyjz201506032 |
[6] | Liu Xuechun, Xu Axin, Zhang Ailin, Ma Jing, Cao Ming, Hui Yi, Zhao Yue. THE STATIC PERFORMANCE ANALYSIS AND EXPERIMENTAL RESEARCH OF THE JOINT IN MODULAR PREFABRICATED HIGH-RISE STEEL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 27-34. |
[7] | Xue Suduo, Gao Zhanyuan, Li Xiongyan, Liang Jin. STUDY ON STATIC PERFORMANCE OF GEIGER RIGID BRACING DOME[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(5): 118-121. doi: 10.13204/j.gyjz201305025 |
[8] | Wang Qingli, Hou Tingting, Li Qinggang, Wang Yue. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR STUB COLUMN(Ⅰ): EXPERIMENTAL STUDY AND FINITE ELEMENT SIMULATION[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 1-7. doi: 10.13204/j.gyjz201303001 |
[9] | Yin Xiaodong, Li Qinggang, Wang Qingli. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR BEAM-COLUMN(Ⅰ): EXPERIMENTAL STUDY AND FINITE ELEMENT SIMULATION[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 24-29. doi: 10.13204/j.gyjz201303005 |
[10] | Wang Qingli, Liu Xiaochen, Li Qinggang, Wang Yue. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR FLEXURAL MEMBER(Ⅰ): EXPERIMENTAL STUDY AND FINITE ELEMENT SIMULATION[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 13-17,29. doi: 10.13204/j.gyjz201303003 |
[11] | Wang Qingli, Li Ruilin, Li Qinggang, Wang Yue. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR STUB COLUMN(Ⅱ): MECHANISM ANALYSIS AND LOAD BEARING CAPACITY[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 8-12. doi: 10.13204/j.gyjz201303002 |
[12] | Yin Xiaodong, Li Qinggang, Wang Qingli. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR BEAM-COLUMN(Ⅱ): MECHANISM ANALYSIS AND LOAD BEARING CAPACITY[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 30-35,7. doi: 10.13204/j.gyjz201303006 |
[13] | Wang Qingli, Wu Jun, Li Qinggang, Wang Yue. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR FLEXURAL MEMBER(Ⅱ): MECHANISM ANALYSIS AND LOAD BEARING CAPACITY[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 18-23. doi: 10.13204/j.gyjz201303004 |
[14] | Li Yan, Hao Jiping, Zhou Qi, Xie Qi, Guo Hongchao. SEMI-RIGIDITY AND INITIAL STIFFNESS OF UNSTIFFENED SINGLESIDED BOLTED-WELDED CONNECTION OF STEEL MOMENT FRAME[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(9): 120-123,75. doi: 10.13204/j.gyjz201109027 |
[15] | Wang Sufang, Chen Yiyi. STIFFNESS COEFFICIENT METHOD TO CALCULATE THE INITIAL STIFFNESS OF END-PLATE JOINT IN SLENDER STEEL FRAME[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(10): 126-131. doi: 10.13204/j.gyjz201010028 |
[16] | Zheng Tingyin, Wu Xinghua, Su Ming, Yang Bo. EFFECT OF STEEL CONCEALED-BEAM ON STATIC PERFORMANCE OF NEW COMBINATORY CONCEALED-BEAM FLOOR[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 51-56,73. doi: 10.13204/j.gyjz200912014 |
[17] | Liu Changjiang, Gu Qiang. HYSTERETIC BEHAVIOR OF FOUR-ANGLE STEEL CONNECTION[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 112-114,131. doi: 10.13204/j.gyjz200902021 |
[18] | Wang Sufang, Chen Yiyi. THEORETICAL MODEL FOR THE INITIAL STIFFNESS OF BOLTED T -STUB CONNECTION[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 80-83. doi: 10.13204/j.gyjz200710022 |
[19] | Bao Kefeng, Ma Wenhong, Du Wenfeng, Xia Fenglin, Wu Hui. STUDY ON STATIC PERFORMANCE OF VIERENDEEL ARCH IN PLANE[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(3): 91-94. doi: 10.13204/j.gyjz200603024 |
[20] | Long Liping, Gu Hongyan, Cui Jia. STATIC BEHAVIOR OF STRESSED SKIN DIAPHRAGM CONNECTED WITH V840 PROFILED SHEET[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(6): 84-85,83. doi: 10.13204/j.gyjz200506024 |