Li Wei, Jia Shuizhong, Li Yaming, Cai Cihong, Zhou Xiaofeng. NUMERICAL SIMULATION OF MEASURES FOR CONTROLLING THE ADVERSE IMPACTS ON THE NEARBY MAIN ENTRANCE BUILDINGS IN SHANGHAI CHENSHAN BOTANICAL GARDEN CAUSED BY TALL FILL[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 16-19,29. doi: 10.13204/j.gyjz201111004
Citation:
Li Wei, Jia Shuizhong, Li Yaming, Cai Cihong, Zhou Xiaofeng. NUMERICAL SIMULATION OF MEASURES FOR CONTROLLING THE ADVERSE IMPACTS ON THE NEARBY MAIN ENTRANCE BUILDINGS IN SHANGHAI CHENSHAN BOTANICAL GARDEN CAUSED BY TALL FILL[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 16-19,29. doi: 10.13204/j.gyjz201111004
Li Wei, Jia Shuizhong, Li Yaming, Cai Cihong, Zhou Xiaofeng. NUMERICAL SIMULATION OF MEASURES FOR CONTROLLING THE ADVERSE IMPACTS ON THE NEARBY MAIN ENTRANCE BUILDINGS IN SHANGHAI CHENSHAN BOTANICAL GARDEN CAUSED BY TALL FILL[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 16-19,29. doi: 10.13204/j.gyjz201111004
Citation:
Li Wei, Jia Shuizhong, Li Yaming, Cai Cihong, Zhou Xiaofeng. NUMERICAL SIMULATION OF MEASURES FOR CONTROLLING THE ADVERSE IMPACTS ON THE NEARBY MAIN ENTRANCE BUILDINGS IN SHANGHAI CHENSHAN BOTANICAL GARDEN CAUSED BY TALL FILL[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 16-19,29. doi: 10.13204/j.gyjz201111004
NUMERICAL SIMULATION OF MEASURES FOR CONTROLLING THE ADVERSE IMPACTS ON THE NEARBY MAIN ENTRANCE BUILDINGS IN SHANGHAI CHENSHAN BOTANICAL GARDEN CAUSED BY TALL FILL
The ultimate bearing capacity of 28 m long pipe pile was analyzed by FLAC 3D.The numerical simulation of construction management plan of main entrance buildings was done.The measures for reducing the adverse impacts of the tall fill were studied.By engineering practice and the full process testing data analysis,it was recognized that the synthetical engineering methods of the isolated area of embankment piles and the reasonable construction management plans were safe and economical.