Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 41 Issue 10
Dec.  2014
Turn off MathJax
Article Contents
Bu Liangtao, Li Yiyue, Liu Xiong. STRENGTHENING DESIGN EXAMPLE OF FRAME COLUMNS BY STAGE REPLACING CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 119-122. doi: 10.13204/j.gyjz201110028
Citation: Bu Liangtao, Li Yiyue, Liu Xiong. STRENGTHENING DESIGN EXAMPLE OF FRAME COLUMNS BY STAGE REPLACING CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 119-122. doi: 10.13204/j.gyjz201110028

STRENGTHENING DESIGN EXAMPLE OF FRAME COLUMNS BY STAGE REPLACING CONCRETE

doi: 10.13204/j.gyjz201110028
  • Received Date: 2011-03-21
  • Publish Date: 2011-10-20
  • A short section concrete of a corner column of a frame prism column on 1th floor is unqualified,the strength of concrete is relatively low,therefore,by comparing the reinforcement schemes of concrete,the method of stage replacing concrete is selected. Because the column has a large part of the structual load,to ensure the structure and the construction operations safety,it is measured the strain of the support structure and the replaced structure and the deformation of unloading points during unloading process,with which the internal forces,deformation,residual deformation of the structure at replaced concrete position can be reflected accurately,which can provides reliable basis for unloading. It is also described the test results of construction and the replacement of the reinforcement effect.Finally,advices of design and construction are also put forward for this sort of project.
  • loading
  • [2] GB 503672006 混凝土结构加固设计规范[S].
    GB 500102002 混凝土结构设计规范[S].
    [3] GB 500092001 建筑结构荷载规范[S].
    [4] GB 500172003 钢结构设计规范[S].
    [5] GB 502042002 混凝土结构工程施工质量验收规范[S].
    [6] 毛桂平.托梁断柱置换局部柱身混凝土实践[J].工程建设与设计,2004(5):46-47.
    [7] 张翼灵,李今保.某工程二层柱置换混凝土加固施工技术[J].工业建筑,2006,36(4):88-90.
    [8] 李今保,计算机应变控制梁柱托换方法在某高层置换混凝土加固工程中的应用[J].工业建筑,2008,38(9):107-111.
    [9] 李树林,陈丽华,孟杰,等.某框架低强度混凝土的结构加固设计和施工技术[J].工业建筑,2009,39(3):119-122.
    [10] 陈尚建,刘海波,欧阳普英,等.置换混凝土法在结构加固设计中的应用[J].武汉大学学报,2008(41):77-79.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (71) PDF downloads(72) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return