Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 41 Issue 10
Dec.  2014
Turn off MathJax
Article Contents
Hua Jianmin, Xie Feifei. MEASURED STUDY ON VERTICAL DEFORMATION OF A TALL STEEL REINFORCED CONCRETE FRAME-CORE WALL STRUCTURE DURING CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 81-84. doi: 10.13204/j.gyjz201110020
Citation: Hua Jianmin, Xie Feifei. MEASURED STUDY ON VERTICAL DEFORMATION OF A TALL STEEL REINFORCED CONCRETE FRAME-CORE WALL STRUCTURE DURING CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 81-84. doi: 10.13204/j.gyjz201110020

MEASURED STUDY ON VERTICAL DEFORMATION OF A TALL STEEL REINFORCED CONCRETE FRAME-CORE WALL STRUCTURE DURING CONSTRUCTION

doi: 10.13204/j.gyjz201110020
  • Received Date: 2011-06-10
  • Publish Date: 2011-10-20
  • Using project measurement of an actual, it is examined the vertical deformation of a tall steel reinforcedconcrete frame-core wall structure during construction. The results show that there is a difference in deformationmagnitude between the steel and concrete in steel reinforced concrete columns, and that deformation compatible timebetween concrete and steel is associated with the concrete strength grade: the higher the concrete strength grade, thelonger the time for deformation compatibility. The maximum value of column vertical deformation is 40710-6 , andthe maximum value of shear wall vertical deformation is 35910-6 . The rate of vertical deformation is faster withinthe initial 14 d; and the ratio of vertical deformation to total deformation after finishing the construction of 42 floors forthe column and shear wall is about 0. 35 and 0.34, and follows a linear relation thereafter.
  • loading
  • 陈灿.高层钢框架- 混凝土核心筒混合结构体系施工期间变形及其控制研究[D].上海: 同济大学,2007.
    [2] Mark F,Ghosh S K.High Rise Design: Accounting for Column Length Changes[J].Civil Engineering,ASCE,1984(4):55-59.
    [3] Jayasinghe M T R,Jayasena W M V P K.Effect of Relative Humidity on Absolute and Differential Shortening of Columns and Walks in Multistory Reinforced Concrete Buildings[J].Practice Periodical on Structural Design and Construction,ASCE,2005(5):88-97.
    [4] 罗文斌,张保印.超高层建筑S + RC 混合结构竖向变形差的工程对策[J].建筑结构学报,2000,21(6):68-73.
    [5] 邓志恒,秦荣.考虑施工过程收缩徐变对高层建筑结构影响理论分析[J].哈尔滨建筑大学学报,2002,35(5):28-31.
    [6] 周绪红,黄湘湘,王毅红,等.钢框架- 钢筋混凝土核心筒体系竖向变形差异的计算[J].建筑结构学报,2005,26 (2):66 -73.
    [7] 周建龙,闫锋.超高层结构竖向变形及差异问题分析与处理[J].建筑结构,2007,3(5):100-103.
    [8] 白国良,王智飞,李晓文.型钢混凝土框架- 钢筋混凝土核心筒混合结构竖向变形差异的计算[J].哈尔滨工业大学学报,2007,39(增刊):610-614.
    [9] 吴锋,殷福新,何转利.高层混合结构设计中竖向差异影响[J].建筑结构学报,2008,29(增刊):197-202.
    [10] Reith R D,Kohan R.Full-Scale Measurments of Rein-Forced Concrete Chimney [C]∥ Conf.on Performance of Building Structures: Scotland.
    [11] Swamy R N,Arumugasaamy P.Deformations in Service of Reinforced Concrete Columns[J].ACI SP55,1978: 15-26.
    [12] Pfeifer D W.Time-Dependent Deformations in 70-Story Structure [J].Symp.On Ddsigning for Effects of Creep,Shrinkage and Temperature in Concrete Structures.Detroit: ACI SP55-27,1983:23-27.
    [13] Russell H G,Corely W G.Time-Dependent Behavior of Columns in Water Tower Place[J].ACI SP55-14,1981: 347-373.
    [14] Russell H G.Field Instrumentation of Concrete Structures[J].ASTM STP-702,1980: 31-33.
    [15] Russell H G,Shiu K N.Creep and Shrinkage Behavior of Tall Buildings and Long Span Bridges[J].Symp.On Fundamental Research on Creep and Shrinkage of Concrete.Lausanne,Switzerland: 1980: 15-17.
    [16] 张琪玮,张保印,牛荻涛.混凝土高层建筑竖向变形差的原位测试与分析[J].建筑结构,2004,34(4):18-20.
    [17] 王晓燕,邓志恒.施工过程混凝土收缩徐变的试验研究[J].广西大学学报: 自然科学版,2005,30(3):193-196.
    [18] 杨丽,郭志恭.高层钢筋混凝土结构设计中如何考虑徐、收缩的作用[J].工业建筑,1995,25(4):40-46.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (67) PDF downloads(106) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return