Citation: | Chen Lanyun, Shu Zhong, Yi Nangai. NUMERICAL SIMULATION OF VERTICAL BEARING CAPACITY OF POST-GROUTING BORED PILES[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(7): 78-81. doi: 10.13204/j.gyjz201107018 |
[2] 胡春林,赵勤.钻孔灌注桩后注浆增强机理分析[J].武汉工业大学学报,1999,24(增刊);421-423.
|
张忠苗,吴世明,包风.钻孔灌注桩桩底后注浆机理与应用研究[J].岩土工程学报,1999,18(4);523-525.
|
[3] Brown D.Effect of Construction on Axial Capacity of Drilled Foundations in Piedmont Soils[J]. Journal of Geotechnical and Geoenvironment Engineering,2002,128(12);967-973.
|
[4] Chang M F, Zhu H.Construction Effect on Load Transfer Along Bored Pile[J]. Journal of Geotechnical and Geoenvironment Engineering,2004,130(4);873-875.
|
[5] 汪鹏程,朱向荣.钻孔灌注桩侧摩阻力静载试验与有限元分析[J].路基工程,2008,3(6);72-73.
|
[6] 何剑.后注浆钻孔灌注桩桩承载力性状试验研究[J].岩土工程学报,2002,106(6);743-746.
|
[7] 王俊杰,朱俊高.不同桩底地层超长桩工作性能的数值模拟.[J].岩土力学,2005,26(2),12-15.
|
[8] 袁登平,黄宏伟.软土地基桩侧负摩阻力研究进展初探[J].土木工程学报,2006(3);21-24.
|
[9] 周健,徐建平.群桩挤土效应的数值模拟.[J].同济大学学报,2000(2);12-13.
|
[10] 陈兰云,陈云敏,张卫民.饱和软土中钻孔灌注桩竖向承载力时效分析[J].岩土力学,2006,27(3);471-474.
|