Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 41 Issue 6
Dec.  2014
Turn off MathJax
Article Contents
Yu Hang, Zha Xiaoxiong. SEISMIC BEHAVIOR OF CFST COLUMN TO BEAM JOINT WITHOUT WELDING IN CONSTRUCTION FIELD:EXPERIMENT AND FE ANALYSIS[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(6): 15-19. doi: 10.13204/j.gyjz201106003
Citation: Yu Hang, Zha Xiaoxiong. SEISMIC BEHAVIOR OF CFST COLUMN TO BEAM JOINT WITHOUT WELDING IN CONSTRUCTION FIELD:EXPERIMENT AND FE ANALYSIS[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(6): 15-19. doi: 10.13204/j.gyjz201106003

SEISMIC BEHAVIOR OF CFST COLUMN TO BEAM JOINT WITHOUT WELDING IN CONSTRUCTION FIELD:EXPERIMENT AND FE ANALYSIS

doi: 10.13204/j.gyjz201106003
  • Received Date: 2011-02-12
  • Publish Date: 2011-06-20
  • A newly developed reinforced concrete(RC)beam to concrete-filled-steel-tube(CFST)column joint without welding in construction field is introduced in this paper.The seismic experiment is conducted on the joint, and the hysteretic curve of the specimen under cyclic loading on column top is obtained.According to the test results, this joint shows good ductility and the ability of energy dissipation, and it can be used to replace the joints with welded reinforcement on the outer annular plate.Moreover, the test is also simulated with FEM, and the results agree well with the skeleton curves obtained from the test.Parametric analysis is conducted on this joint, with the consideration of different design of beam, column and steel bracket, and the failure mode is discussed.
  • loading
  • [2] 吕西林,李学平.方钢管混凝土结构应用技术研究[J].建筑施工,2000(3):48-54.
    吴家平,钟善桐.钢管混凝土多层框架结构梁柱刚性节点的研究[J].哈尔滨建筑工程学院学报,1986(4):1-15.
    [3] 李帼昌,赵兴,杨景利,等.钢筋贯通式钢管煤矸石混凝土节点的试验[J].沈阳建筑大学学报:自然科学版,2009(4):699-703.
    [4] 李至钧,阎善章.钢管混凝土框架梁柱刚性抗震节点的试验研究[J].工业建筑,1994,24(2):8-15.
    [5] 韩小雷,陈晖,季静.穿心暗牛腿钢管混凝土柱节点的试验研究[J].华南理工大学学报:自然科学版,1999,27(10):96-101.
    [6] 季静,陈庆军,韩小雷.穿心暗牛腿钢管混凝土柱节点的模型试验研究[J].华南理工大学学报:自然科学版,2001(7):71-74.
    [7] 韩小雷,王永仪,季静,等.穿心暗牛腿钢管混凝土柱节点的试验研究[J].工业建筑,2002,32(7):68-70.
    [8] 王文达,王旭生,于清.地下工程中钢管混凝土柱- RC 梁节点选型及力学性能研究[J].铁道建筑,2009(8):66-70.
    [9] 钟善桐,刘志斌.钢管混凝土柱钢筋混凝土双梁节点的刚性研究[J].哈尔滨建筑大学学报,2001(4):26-29.
    [10] 孙修礼. RC 梁-钢管混凝土柱框架节点试验研究[J].河北理工大学学报:自然科学版,2008(3):96-100.
    [11] 梅力彪,周云,阴毅.穿心暗牛腿钢管混凝土柱单梁节点空间非线性有限元分析[J].工业建筑,2004,34(9):81-83.
    [12] 梅力彪,周云,阴毅.钢管混凝土柱不同构造单梁穿心节点的有限元分析[J].钢结构,2006,21(1):57-61.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (96) PDF downloads(96) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return