Citation: | Pang Rui, Liang Shuting, Zhu Xiaojun. STATE-OF-THE-ART OF OVERSEAS RESEARCH OF PRECAST DOUBLE-TEE FLOORS[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(3): 121-126. doi: 10.13204/j.gyjz201103024 |
[2] Yee A A.Social and Environmental Benefits of Precast ConcreteTechnology[J].PCI Journal,2001,46(3):14-19.
|
Yee A A.预制与预应力混凝土的结构和经济效益[J].建筑结构,2002,32(6):3-7.
|
[3] 建设部.建筑工业化发展纲要[J].施工技术,1995(8):1-3.
|
[4] 陈铁,曹明星,张清亮.双T板在工业厂房中的应用比较[J].工程建设与设计,2008(2):49-51.
|
[5] 何德湛,贾方树.一种房屋建筑的轻型屋盖构件预应力混凝土双T板[J].预应力技术,2008(5):8-10.
|
[6] Naito C,Liling Cao,Wesley Peter.Precast Concrete Double-TeeConnections,part1:Tension Behavior[J].PCI Journal,2009(2):49-65.
|
[7] Neil M Hawkins,Chosh S K.Proposed Revisions to1997NEHRPRecommended Provisions for Seismic Regulations for PrecastConcrete Structures Part3-Diaphragms[J].PCI Journal,2000(3):50-59.
|
[8] ACI Committee318,ACI318R05,ACI318-05,Building CodeRequirements for Structural Concrete and Commentary[S].American Concrete Institute,Farmington Hills,MI,2005.
|
[9] Fleischman R B,Naito C,Restrepo J,et al.Seismic DesignMethodology for Precast Concrete Diaphragms,Part1:DesignFramework[J].PCI Journal,2005(5):68-83.
|
[10] Zheng W.Oliva M O.A Practical Method to Estimate ElasticDeformation of Precast Pretopped Double Tee Diaphragms[J],PCIJournal,2005(2):44-55.
|
[11] Zheng W.Analytical Method for Assessment of Shear CapacityDemand for Untopped Precast Double-Tee Diaphragms Joined byMechanical Connectors[D].Ph.D.Dissertation,University ofWisconsin-Madison,Madison,WI,2001.
|
[12] PCI Industry Handbook Committee,2004.PCI Design Handbook:Precast and Prestressed Concrete(6th ed)[S].Chicago,IL:PCI.
|
[13] Naito C,L Cao.Precast Diaphragm Panel Joint ConnectorPerformance[C]∥Paper2722,Proceedings13th WorldConference on Earthquake Engineering,Vancouver,Canada:2004.
|
[14] Cao L,Naito C.Design of Precast Diaphragm Chord Connectionsfor In-Plane Tension Demands[J].ASCE,Journal of StructuralEngineers,2007,133(11):1627-1635.
|
[15] L Cao,Naito C.Precast Concrete Double-Tee Connections,Part2:Shear Behavior[J].PCI Journal,2009(2):97-115.
|
[16] Fleischman R B,Wan G.Appropriate Overstrength of ShearReinforcement in Precast Concrete Diaphragms[C]∥ASCE J.Struct.Engrg,Special Issue:Precast/Prestressed ConcreteStructures under Natural and Human-Made Hazards,2007,133(11):1616-1626.
|
[17] Pincheira J A,Oliva M G,W Zheng.Behavior of Double-TeeFlange Connectors Subjected to In-Plane Monotonic and ReversedCyclic Loads[J].PCI Journal,2005(6):2-24.
|
[18] Venuti,William J.Diaphragm Shear Connections Between Flangesof Prestressed Concrete T-beams[J].PCI Journal,1970(1):67-78.
|
[19] Seo C.Behavior and Design of Shear Leg for Shear ConnectorsBetween Double Tee Members[R].MS Report,University ofWisconsin,Madison,WI,1997:93.
|
[20] Fleischman R B,Sause R,Pessiki S,et al.Seismic Behavior ofPrecast Parking Structure Diaphragms[J].PCI Journal,1998(1):38-53.
|
[21] Farrow K T,Fleischman R B.Effect of Dimension andConstruction Detail on the Capacity of Diaphragms in PrecastParking Structures[J].PCI Journal,2003(5):46-61.
|
[22] Fleischman R B,Farrow K T.Seismic Design Recommendationsfor Precast Concrete Diaphragms in Long Floor Span Construction[J].PCI Journal,2003(6):46-62.
|
[23] Cleland N M,Ghosh S K.Untopped Precast Concrete Diaphragmsin Hight-Seismic Application[J].PCI Journal,2002(1):94-99.
|
[24] Fleischman R B,Naito C J,Restrepo J,et al.Seismic DesignMethodology for Precast Concrete Diaphragms,Part2:ResearchProgram[J].PCI Journal,2005(6):2-19.
|
[25] Nigel Priestley M J.Overview of PRESSS Research Program[J].PCI Journal,1991(4):50-57.
|
[26] Fleischman R B,Farrow K T,Eastman K.Seismic Response ofPerimeter Lateral-System Structures with Highly FlexibleDiaphragms[J].Earthquake Spectra,2002(5):251-286.
|
[27] Schoettler M J,Belleri A,Zhang D,et al.Preliminary Results ofthe Shake-Table Testing for the Development of a DiaphragmSeismic Design Methodology[J].PCI Journal,2009(2):100-123.
|