Zhao Yankai, Liu Caiwei. NEW CONSTRUCTION TECHNOLOGY OF HIGH AND BIG SHEAR WALLS FOR SWIMMING AND DIVING HALL OF QINGDAO YIZHONG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 123-127. doi: 10.13204/j.gyjz201008028
Citation:
Zhao Yankai, Liu Caiwei. NEW CONSTRUCTION TECHNOLOGY OF HIGH AND BIG SHEAR WALLS FOR SWIMMING AND DIVING HALL OF QINGDAO YIZHONG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 123-127. doi: 10.13204/j.gyjz201008028
Zhao Yankai, Liu Caiwei. NEW CONSTRUCTION TECHNOLOGY OF HIGH AND BIG SHEAR WALLS FOR SWIMMING AND DIVING HALL OF QINGDAO YIZHONG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 123-127. doi: 10.13204/j.gyjz201008028
Citation:
Zhao Yankai, Liu Caiwei. NEW CONSTRUCTION TECHNOLOGY OF HIGH AND BIG SHEAR WALLS FOR SWIMMING AND DIVING HALL OF QINGDAO YIZHONG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 123-127. doi: 10.13204/j.gyjz201008028
It was analyzed the construction difficulties of this sort of shear wall for the swimming and diving hall of Qingdao Yizhong Stadium in the light of its features; it was also explored the quality problems during construction of the shear wall using current methods. Finally it was proposed a new construction technology of the shear wall,i. e.the method oftwo-way and four control lines,after summarizing current construction technologies. With which multicontrol measure could be used for its quality control. It is simple and convenient for operation,and is proved effective in practice.