Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 40 Issue 4
Dec.  2014
Turn off MathJax
Article Contents
Zhou Haiying, Chen Tingguo, Li Lixin. STUDY ON JOINT LOAD TEST OF METRO SHIELD TUNNELING LINING[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(4): 79-83. doi: 10.13204/j.gyjz201004018
Citation: Zhou Haiying, Chen Tingguo, Li Lixin. STUDY ON JOINT LOAD TEST OF METRO SHIELD TUNNELING LINING[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(4): 79-83. doi: 10.13204/j.gyjz201004018

STUDY ON JOINT LOAD TEST OF METRO SHIELD TUNNELING LINING

doi: 10.13204/j.gyjz201004018
  • Received Date: 2009-10-15
  • Publish Date: 2010-04-20
  • Based on load test of joint of shield tunneling lining,joint strength,force and deformation rule,the main influence factors of joint bending stiffness are studied. The results indicate that the segment joint local bearing capacity determines the integral bearing capacity of segment joint under positive eccentric load,the segment joint bearing capacity is sufficient and safe for negative eccentric load,and the joint displacement determines bearing capacity of segment joint for negative eccentric load. The eccentricity and axial force,the thickness of cushion and bolt pretension have great influence on joint bending stiffness of lining segment.
  • loading
  • GB 50157-2003 地铁设计规范[S].
    [2] 刘建航,候学渊. 盾构隧道法[M]. 北京: 中国铁道出版社,1991.
    [3] 张厚美. 装配式双层衬砌接头荷载试验与结构计算理论南水北调中线穿黄隧洞结构计算模型研究[D]. 上海:同济大学,2000.
    [4] Donde P M,Wang J J. Shear Transfer Through Bolts in Segmental Tunnel Linings [G]//Towards New Worlds in Tunnelling.Rotterdam: Balkema,1992.
    [5] Munfah N A,Michael P. Della Posta. Full Scale Testing of Tunnel Liner[G]//Towards Worlas in Tunnelling. Rotterdam: Balkema,1992.
    [6] Toshihiro Asakura,Yoshiyuki Kojima,Toyohiroanda,et al.Analysis on the Behavior of Tunnel Lining Experiment and Simulation on Double Track Tunnel Lining[J ]. QR of RIRT,1992,133 (4).
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (89) PDF downloads(116) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return