| Citation: | Wang Mei, Liang Shuting, Li Keming, Zhu Xiaojun, Pang Rui. FORCED PERFORMANCES STUDY ON TOTAL-PRECAST CONCRETE FRAME COLUMN WITH ALVEOUS-CONNECTION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 69-73. doi: 10.13204/j.gyjz201002016 |
|
[2] 薛伟辰.预制混凝土框架结构体系研究与应用进展[J].工业建筑,2002,32(11):47-50.
|
|
Prestressed ConcreteInstitute. PCI DesignH and book[M].1978:5-51.
|
|
[3] 唐九如.钢筋混凝土框架节点抗震[M].南京:东南大学出版社,1989:197-278.
|
|
[4] 李湘洲.国外预制装配式建筑的现状[J].建筑科学,2004,16(6):24-27.
|
|
[5] Fu F,LamD. Experimental StudyonSemi-Rigid Composite Jointswith Steel Beams and Precast Hollowcore Slabs.[J]. Journal of Constructional Steel Research,2006:771-782.
|
|
[6] Zhu Zhenyu,A M ASCE,Iftekhar Ahmad,et al. Seismic Performance of Concrete-Filled FRP Tube Columns for Bridge Substructure[J]. Journal of Bridge Engineering,2006(5):359-370.
|
|
[7] 赵斌,吕西林,刘海峰.预制高强混凝土结构后浇整体式梁柱组合件抗震性能试验研究[J].建筑结构学报,2004,25(6):22-28.
|
|
[8] 柳炳康,张瑜中,晋哲锋,等.预压装配式预应力混凝土框架接合部抗震性能试验研究[J].建筑结构学报,2005,26(2):60-66.
|
|
[9] 李忠献,张雪松,丁阳.装配整体式型钢混凝土框架节点抗震性能研究[J].建筑结构学报,2005,26(4):32-38.
|