Citation: | Hu Changming, Liu Hongliang, Zeng Fankui, Ge Zhaoshen, Yin Hongbing. RESEARCH ADVANCES FOR COUPLER IN RESEARCH ON STEEL TUBE TALL FALSEWORK[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 1-6. doi: 10.13204/j.gyjz201002001 |
[2] 施炳华.探讨扣件式钢管脚手架的稳定计算问题[J].施工技术,2004,33(2):21-22.
|
杜荣军.扣件式钢管模板高支撑架的设计和使用安全[J].施工技术,2002,31(3):3-8.
|
[3] 杜荣军.脚手架结构的稳定承载能力[J].施工技术,2001,30(4):1-5.
|
[4] 赵滇生,田兴长,章雪峰,等.扣件式钢管模板高支撑架整体稳定分析[J].浙江工业大学学报,2007,35(1):78-81.
|
[5] Lightfoot E,Oliveto G. Collapse Strength of Tubular Steel Scaffold Assemblies[J]. Proceedings of the Institution of Civil Engineers(London). Partl-Design Construction,1977,63(2):311-329.
|
[6] Huang Y L,Chen H J,Rosowsky D V,et al. Load-Carrying Capacities and Failure Modes of Scaffold-Shoring Systems,PartⅠ:Modeling and Experiment[J]. Structural Engineering and Mechanics,2000,10(l):53-66.
|
[7] Huang Y L,KaoY G,Rosowsky D V. Load-Carrying Capacities and Failure Modes of Scaffold-Shoring Systems,Part Ⅱ: AnAnalytical Model and Its Closed-Form Solution[J]. Structural Engineering and Mechanics,2000,10(l):67-79.
|
[8] 邢卫晋,郝钧,熊耀莹.关于我国模架事故的普遍性与必然性的讨论[J].中国建筑金属结构,2008(2):47-49.
|
[9] 胡长明.扣件联接钢结构试验及其理论研究[D].西安:西安建筑科技大学,2008.
|
[10] 杜荣军.混凝土工程模板与支架技术[M].北京:机械工业出版社,2004.
|
[11] YueF,YuanY,LiG Q. Wind Load on Integral-LiftScaffolds for TallBuildingConstruction[J]. Journal of Structural Engineering,ASCE,2005,131(5):816-824.
|
[12] Jamshid Mohammadi,AmirZamani Heydari. Seismic and Wind Load Considerations for Temporary Structures[J]. Practice Periodical on Structural Design and Construction,ASCE,2008,13(3):128-134.
|
[13] 张传敏.方东平,耿东川,等.钢筋混凝土结构施工活荷载现场调查与统计分析[J].工程力学,2002,19(5):62-66.
|
[14] 丁洁民,沈祖炎.一种半刚性节点的实用计算模型[J].工业建筑,1992,22(11):29-32.
|
[15] 陈国栋,房贞政.半刚性连接钢框架的二阶弹性分析[J].福州大学学报:自然科学版,2000,28(6):66-67.
|
[16] 侯和涛,李国强.初始几何缺陷对非强支撑钢框架柱性能的影响[J].工程力学,2008,25(3):85-90.
|
[17] 胡长明,沈勤,曾凡奎,等.高大模板扣件式支撑体系施工技术研究报告[R],西安:西安建筑科技大学,2008.
|
[18] 徐崇宝,张铁铮,潘景龙,等.双排扣件式钢管脚手架工作性能的理论分析与试验研究[J].哈尔滨建筑工程学院学报,1989,22(2):38-55.
|
[19] 肖炽,周观根,刘扬.扣件式钢管格构支架整体稳定性计算理论和试验研究[J].施工技术,2007,36(11):25-29.
|
[20] 姜旭,张其林,顾明剑,等.新型插盘式脚手架的试验和数值模型研究[J].土木工程学报,2008,41(7):55-60.
|
[21] 谢楠,王勇.超高模板支架的极限承载力研究[J].工程力学,2008,25(增刊):148-153.
|
[22] Homes M,Hindson D. Structural Behaviour of Load BearingFalsework[J]. Proceedings of the Institution of Civil Engineers(London). Part 1-Design Construction,1979,65(2).
|
[23] Br and RE. Stability of Tubular Scaffolding[J]. Civil Engineering and Public Works Review,1972,67(791).
|
[24] Br and R E. Stability of TubularScaffolding[J]. CivilEngineering and Public Works Review,1973,68(808):991-1001.
|
[25] Yu W K,Chung K F,ChanS L. StructuralInstability of Multi-Storey Door-Type Modular Steel Scafflods[J]. Engineering Structures,2004,26(7):867-881.
|
[26] Weesner LB,JonesH L. Experimental and Analytical Capacity of Frame Scaffolding[J]. Engineering Structures,2001,23(6):592-599.
|
[27] PengJL,ChanSL,WuC L. Effects of Geometrical Shape and Incremental Loads on Scaffold Systems[J]. Journal of Constructional Steel Research,Elsevier Science Direct,2007,63:448-459.
|
[28] PengJui-Lin . Stability Analyses and Design Recommendations for Practical Shoring Systems During Construction[J]. Journal of Construction Engineering and Management,ASCE,2002,128(6):536-544.
|
[29] PengJL,PanA D,ChenW F. Approximate Analysis Method for Modular Tubular Falsework[J]. Journal of Structural Engineering,ASCE,2001,127(3):256-263.
|
[30] Lew H S. Construction Loads and Load Effects in ConcreteBuilding Construction[J]. Concrete International: Design and Construction,1985,7(4):157-76.
|
[31] 孙作功.扣件式钢管脚手架应用及可靠度分析[D].上海:同济大学,2003.
|
[32] 赵挺生,王泽辉,顾样林.基于统计的模板支撑设计参数[J].施工技术,2005,34(3):49-52.
|
[33] 苗吉军,顾样林,方晓铭.高层建筑混凝土结构施工活荷载的统计分析[J].建筑结构,2002,32(3):7-9.
|
[34] 袁雪霞,金伟良,刘鑫,等.扣件式钢管模板支撑方案的模糊风险分析模型[J].浙江大学学报,2006,40(8):1371-1376.
|
[35] Hu Changming,Zeng Fankui,Liu Xuebing,etal. Study on the Risk-Assessment of High-Formwork Supports[C]∥ Proceedings of 2008 International Conference on Risk and Reliability Management.2008:341-345.
|
[36] 葛召深,胡长明,王静,等.扣件式钢管模板支架剪刀撑研究[J].施工技术,2009,39(8):62-65.
|
[37] 胡长明,董攀,沈勤,等.扣件式钢管高大模板支架整体稳定试验分析[J].施工技术,2009,39(4):70-72.
|
[38] 胡长明,曾凡奎,沈勤,等.构造因素对高支模稳定承载力的影响[J].华中科技大学学报:城市科学版,2008,25(4):57-60.
|
[39] 曾凡奎,刘学兵,胡长明.高大模板支架承受的两种特殊荷载分析及建议[J].青岛农业大学学报:自然科学版,2007,24(4):308-309.
|
[40] 曾凡奎,李昌华,李新闻,等.扣件式高大模板支架现场试验研究[J].施工技术,2009,39(8):60-61.
|
[41] 尹洪冰.扣件式高大模板支撑体系稳定性研究[D].西安:西安建筑科技大学,2008.
|
[42] 张化振.扣件式高大模板支架的节点半刚性和整体承载力研究[D].西安:西安建筑科技大学,2008.
|
[43] 曾凡奎.法门寺合十舍利塔施工关键技术研究[D].西安:西安建筑科技大学,2008.
|
[44] 闫鑫,胡长明,曾凡奎,等.顶端伸出长度对高大模板支架稳定承载力的影响[J].施工技术,2009,39(4):73-75.
|