Liu Junwei, Zhang Mingyi, Xie Jian, Yu Xiuxia, Li Ruijun. COMPUTATIONAL SIMULATION OF TIME-EFFECT ON BEARING CAPACITY OF JACKED PILE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 64-67. doi: 10.13204/j.gyjz201001017
Citation:
Liu Junwei, Zhang Mingyi, Xie Jian, Yu Xiuxia, Li Ruijun. COMPUTATIONAL SIMULATION OF TIME-EFFECT ON BEARING CAPACITY OF JACKED PILE[J]. INDUSTRIAL CONSTRUCTION , 2010, 40(1): 64-67. doi: 10.13204/j.gyjz201001017
Liu Junwei, Zhang Mingyi, Xie Jian, Yu Xiuxia, Li Ruijun. COMPUTATIONAL SIMULATION OF TIME-EFFECT ON BEARING CAPACITY OF JACKED PILE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 64-67. doi: 10.13204/j.gyjz201001017
Citation:
Liu Junwei, Zhang Mingyi, Xie Jian, Yu Xiuxia, Li Ruijun. COMPUTATIONAL SIMULATION OF TIME-EFFECT ON BEARING CAPACITY OF JACKED PILE[J]. INDUSTRIAL CONSTRUCTION , 2010, 40(1): 64-67. doi: 10.13204/j.gyjz201001017
COMPUTATIONAL SIMULATION OF TIME-EFFECT ON BEARING CAPACITY OF JACKED PILE
1.
1. Key Laboratory of Soft Soils and Geoenvironment Engineering of Ministry of Education,Zhejiang University,Hangzhou 310058,China;
2.
2. Qingdao Technological University,Qingdao 266033,China;
3.
3. Jining Construction School,Jining 272000,China;
4.
4. Qingdao Institute of Architectural Design Co.Ltd,Qingdao 266520,China;
5.
5. Hebei Institute of Architecture Civil Engineering,Zhangjiakou 075024,China
Received Date: 2009-06-28
Publish Date:
2010-01-20
Abstract
The improvement of bearing capacity dependeds on three aspects of soil consolidation,disturb-restore property and shell-effect.The effect of soil consolidation is most important,so the law of time-effect is studied from this aspects of pore pressure dissipation and effective stress increase.By using the theory of spherical cavity expansion,imaging method and formula Henkel,the expression of stress increase after installation is deduced and the expression of pore pressure at any time by computing the equation of pore pressure and time,then stimulation computation method of bearing time-effect in saturated soil is presented.Comparing with test results,it is showed that the calculation is receivable.
References
[2] 费勤发,马海龙.饱和软土中排土桩桩侧摩阻力时效问题研究[J].苏州城建环保学院学报,1995,8(4):35-40
胡琦,蒋军,严细水,等.回归法分析预应力管桩单桩极限承载力时效性[J].哈尔滨工业大学学报,2006,38(4):602-605.
[3] 孙更生,郑大同.软土地基与地下工程[M].北京:中国建筑工业出版社,1984.
[4] 王伟,卢廷浩,宰金珉.单桩极限承载力时间效应估算方法比较[J].岩土力学,2005,26(增刊):244-247.
[5] Vesic A C. Expasion of Cavity in Infinite Soil Mass[J]. Journal of Soil Mechanics and Foundation Division,ASCE,1972,98(3):265-289.
[6] 龚晓南.土塑性力学[M].杭州:浙江大学出版社,1999:262-266.
[7] 张明义.层状地基上静力压入桩的沉桩过程及承载力的试验研究[D].重庆:重庆大学,2001.
[8] Sagaseta C. Analysis of Undrained Soil Deformation Due to GroundLoss[J]. Geotechnique,1981,37(3):301-320.
[9] 李月健.土体内球形空穴扩张及挤土沉桩机理研究[D].杭州:浙江大学,2001.
[10] 王伟.打桩引起的超孔隙水压力的预测及其应用[D].南京:南京工业大学,2002.
[11] 宰金珉,王伟,王旭东,等.静压桩引起的超孔隙水压力及单桩极限承载力预测[J].工业建筑,2004,34(8):33-35.
[12] 唐世栋.用有效应力原理分析桩基承载力的变化全过程[D].上海:同济大学,1990.
[13] Seed H B,Reese L C. The Action of Soft Clay A long Friction Pile[J]. C ivil Engin eers,1995(81):840-842.