Citation: | Zhang Yuntao, Meng Shaoping, Xi Zhuo, Pan Zuanfeng, Lin Bo. EXPERIMENTAL RESEARCH ON PRESTRESSING TIME-DEPENDENT LOSS OF HIGH-PERFORMANCE CONCRETE BEAMS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 21-25. doi: 10.13204/j.gyjz200912006 |
[2] Youakim Samer A,Ghali Amin,Hida Susan E.Prediction of Long-Term Prestress Losses[J].PCI Journal,2007,52(2):116-130.
|
陈永春,徐金声,高红旗.预应力构件钢筋松弛和混凝土收缩徐变应力损失的计算[J].建筑科学,1987(3):3-13.
|
[3] Stallings J Michael,Barnes Robert W,Eskildsen Sam.Camber andPrestress Losses in Alabama HPC Bridge Girders[J].PCI Journal,2003,48(5):90-104.
|
[4] Barr P J,Kukay B M,Halling M W.Comparison of Prestress Lossesfor a Prestress Concrete Bridge Made with High-Performance Concrete[J].Journal of Bridge Engineering,2008,13(5):468-475.
|
[5] Li Jianyong,Yao Yan.A Study on Creep and Drying Shrinkage ofHigh Performance Concrete[J].Cement and Concrete Research,2001,31:1203-1206.
|
[6] JTG D62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范[S].
|
[7] GB 50010-2002混凝土结构设计规范[S].
|
[8] TB 10002.3-2005,J 462-2005铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].
|
[9] Magura D D,Sozen M A,Siess C P.A Study of Stress Relaxation inPrestressing Reinforcement[J].PCI Journal,1964,9(2).
|
[10] 谢峻,王国亮,郑晓华.大跨径预应力混凝土箱梁桥长期下挠问题的研究现状[J].公路交通科技,2007,24(1):47-50.
|