Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 39 Issue 9
Dec.  2014
Turn off MathJax
Article Contents
Zhou Tong, Wu Xiaogui, Qiu Xihong. CONTROL AND MONITORING OF TEMPERATURE CRACKS OF BASEMENT WALL FOR SHANGHAI SCIENCE MUSEUM[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(9): 81-84. doi: 10.13204/j.gyjz200909017
Citation: Zhou Tong, Wu Xiaogui, Qiu Xihong. CONTROL AND MONITORING OF TEMPERATURE CRACKS OF BASEMENT WALL FOR SHANGHAI SCIENCE MUSEUM[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(9): 81-84. doi: 10.13204/j.gyjz200909017

CONTROL AND MONITORING OF TEMPERATURE CRACKS OF BASEMENT WALL FOR SHANGHAI SCIENCE MUSEUM

doi: 10.13204/j.gyjz200909017
  • Received Date: 2009-03-15
  • Publish Date: 2009-09-20
  • In the project of Shanghai Science Museum,the pre-stressing technology was used to control the cracking of the arc shaped ultra-long basement wall.The steel string type steel bar taseometer was installed in the wall in advance to examine the pre-stressing value.The measurement of the change of the pre-stressing value in the wall was lasted for eight month.The results indicated that the pre-stressing exerted on the wall has met the designed requirements.The changing of the pre-stressing value displays certain regularity in the time and the space.In the time,the performance is,the pre-stressing value of identical measuring point is firstly increasing gradually along with the time,finally tends to stability.In the space,the performance is: verticaly,in the wall,the pre-stressing value is small nearby the basement roof,then it will become the biggest at a place with some distance away from the basement roof,after that,it will reduce gradually.In crosswise,the pre-stressing value is biggest in both the tensile ends,it will then reduce gradually to the middle of the wall.Meanwhile,the crack monitoring instrument was used to monitor the cracks,the result showed that the concrete crack quantity and the scale finally were under control.The practice indicated that the pre-stressing technology is an ideal method to control the cracks of ultra-long concrete structures.
  • loading
  • 上海建工(集团)总公司.上海科技馆综合设计施工技术研究
    (1):预应力控制地下室外墙裂缝技术[R].上海:上海建工(集团)总公司,2001.
    [2] 李亚明,姚念亮.上海科技馆地下室外墙控制裂缝设计[J].工业建筑,2001,31(10):13-15.
    [3] 王铁梦.工程裂缝控制技术[M].北京:中国建筑工业出版社,1997.
    [4] 王铁梦.工程结构裂缝控制的综合方法[J].施工技术,2000,29(5):5-9.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (54) PDF downloads(71) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return