Citation: | Guo Jinjun, Shi Jianyong. LABORATORY STRAIN-HOLDING TESTS OF SET-UP OF JACKED-IN PILES IN SAND[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(7): 61-66. doi: 10.13204/j.gyjz200907018 |
Axelsson,Gary.Long-Term Set-Up of Driven Piles in Sand[D].Stockholm:Trita-AMI PHD 1035,Division of Soil and RockMechanics,Department of Civil and Environmental Engineering,RoyalInstitute of Technology,2000;
|
[2] ChowF C,Jardine RJ,Nauroy J F,et al.Time-Related Increase inShaft Capacities of Driven Piles in Sand[J].G啨otechnique,1997,47(2):353-361;
|
[3] Lehane B M,Jardine R J,Bond AJ,et al.Mechanisms of ShaftFriction in Sand from Instrumented Piles Tests[J].Journal ofGeotechnical Engineering,ASCE,1993,119(1):19-35;
|
[4] Schmertmann J H.The Mechanical Aging of Soils[J].Journal ofGeotechnical Engineering,ASCE,1991,117(9):1288-1330;
|
[5] Baligh M M.Strain Path Method[J].Journal of GeotechnicalEngineering,Div.ASCE,1985,111(9):1108-1136;
|
[6] Elisabeth TB,Kenichi S.Mechanisms of Setup of Displacement Pilesin Sand:Laboratory Creep Tests[J].Canadian Geotechnical Journal,2005,42(5):1391-1407;
|
[7] White DJ,Bolton MD.Displacement and Strain Paths During Plane-Stain Model Pile Installationin Sand[J].G啨otechnique,2004,54(6):375-397;
|
[8] 孙钧.岩土材料流变及其工程应用[M].北京:中国建筑工业出版社,1999;
|
[9] 维亚洛夫C C.土力学的流变原理[M].北京:科学出版社,1987;
|
[10] Jardine R J,Standing J R,Chow F C.Some Observations of theEffects of Time on the Capacity of Piles Driven in Sand[J].G啨otechnique,2006,56(4):227-244;
|
[11] Bullock PJ,Schmertmann J H,Mcvay MC,et al.Side Shear SetupⅡ:Results fromFlorida Test Piles[J].Journal of Geotechnical andGeoenvironmental Engineering,ASCE,2005,131(3):301-310;
|
[12] Zhao Y.Pile Set-Up in Sand[D].Cambridge,U K:EngineeringDepartment,Cambridge University,2002.
|