Citation: | Zhou Hongbo, Cai Laibing, Gao Wenjie. RISK IDENTIFICATION AND SENSITIVITY ANALYSIS OF LEAKAGE OF SLURRY WALL FOR DEEP EXCAVATIONS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(4): 84-87. doi: 10.13204/j.gyjz200904019 |
刘梅斌,地下铁道车站几种渗漏现象的原因分析[J].建筑技术,2001(4):256-257;
|
[2] 叶辉.深基坑工程地下连续墙渗漏原因分析及预防[J].铁道勘查,2006(2):65-66;
|
[3] 董晓斌.地下连续墙接头缝渗漏水综合堵漏处理的施工实践[J].西部探矿工程,2006(6);
|
[4] 刘普寅,吴孟达.模糊理论及其应用[M].长沙:国防科技大学出版社,1998:9-43;
|
[5] 仲景冰,李惠强,吴静.工程失败的路径及风险源因素的FTA分析方法[J].华中科技大学学报(城市科学版),2003,20(1):14-17;
|
[6] Goulielmos A M,Kostas Giziakis.Risk of Collisions and GroundingsinBulk Carries and Tankers[C]//The Proceedings of the SeventhInternational Off-Shore and Polar Engineering Conference.USA:International Society of Offshore and Polar Engineers,1997:275-288;
|
[7] Furuta H,Shiraishi N.Fuzzy Importance in Fault Tree Analysis[J].Fuzzy Set and System,1984(12):205-213;
|
[8] Tanaka L,Fan T,Taguchi K.Fault-Tree Analysis by FuzzyProbability[J].IEEE Trans on Reliability,1983,32:453-45;
|
[9] 边亦海,黄宏伟.SMW工法支护结构失效概率的模糊事故树分析[J].岩土工程学报,2006(5):664-668.
|