Citation: | Fu Yawei, Wang Guanhu[WT], Liu Zhiqun, Liu Wei. FEASIBILITY AND DESIGN METHOD OF PASSIVE SOLAR HOUSE IN NORTHWEST AREA[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 120-123. doi: 10.13204/j.gyjz200812032 |
Jean Louis Briand,William F Powers,David E.Weatherby Should Grouted Anchors Have Short Tendon Bond and Length.Journal of Geotechnlcal and Geoenvironmental Engineering,ASCE,1998,124(2):110-118
|
[2] 高永涛,张友葩,吴顺川,等.滑移岩石边坡加固后的稳定性分析.岩石力学与工程学报,2002,21(增2):2 562-2 569
|
[3] 高永涛,张怀静.失稳坡间桥台基础的加固.北京科技大学学报,2006,28(2):104-107
|
[4] Yoo Chungsik.Bahaviour of Braced and Anchored Walls in Soils Overlying Rock.Journal of Geotechnical and Gecenvironmental Engineering,ASCE,2001,127(3):225-232
|
[5] 高永涛,成子桥.非稳定边坡坡间挡土墙双锚建造技术.公路交通科技,2005,22(4):27-30
|
[6] 张友葩,高永涛,王杰林,等.动载荷下土质边坡的失稳分析.北京科技大学学报,2003.25(2):110-117
|
[7] Cao Yongtao,Sun Jianbo,Wu Shunchuan,et al.Cut Slope Reinforcement Technique in Open-Pit Mines,Journal of Beijing University of Science and Technology,2004,11(4):289-292
|
[8] 高永涛,吴顺川,孙金海.等.高填方路基单纯侧滑失稳治理的理论研究与工程应用.公路交通科技,2004,21(9):9-12
|
[9] 高永涛,张怀静.孙金海,等.预应力锚杆锚固段应力分布规律及应用.北京科技大学学报,2002,24(4):387-390
|
[10] 肖世国,周德培.非全长粘结形锚索锚固段长度的一种确定方法.岩石力学与工程学报,2002,23(9):1 530-1 534
|